Tender Details
Particulars | Details |
---|---|
Title |
Retrofitting And Repairing Of Existing Vrv/Vrf Air Conditioning System At Second Floor And Basement In Permanent Stand At Sports Complex. Cluster Innovation Centre, University Of Delhi. (Part B)
|
Description |
Retrofitting And Repairing Of Existing Vrv/Vrf Air Conditioning System At Second Floor And Basement In Permanent Stand At Sports Complex. Cluster Innovation Centre, University Of Delhi. (Part B)
|
Organisation | Delhi University | Central Govt. Ministry/Department |
Tender Id | 2025_DU_852213_1 |
Reference Number |
CEET-6429 |
Tender Fee | 1000 |
EMD | 2.53 Lakh |
Tender Value | |
Place | North Campus |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=895850 |
Start Date | March 06, 2025 23:30 |
End Date |
17/03/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of vrf air conditioning system of 80 hp 2 x 22 hp 2 x 18 hp and associated works including the buyback of existing vrf system in 3rd floor new core lab building
Sitc of vrf air conditioning system of 80 hp 2 x 22 hp 2 x 18 hp and associated works including the buyback of existing vrf system in 3rd floor new core lab building
Read moreTender for supply, replacement, installation, testing and commissioning of vrv and vrf type air conditioning system for library and conference hall
Tender for supply, replacement, installation, testing and commissioning of vrv and vrf type air conditioning system for library and conference hall
Read moreConst and devel of various building i.e. academic building,hostel building,auditorium,gym and indoor sports building,shopping centre building,etc at permanent campus of central university of odisha,sunabeda on epc(epc mode-ibasis)inc.oandm of36 month
Const and devel of various building i.e. academic building,hostel building,auditorium,gym and indoor sports building,shopping centre building,etc at permanent campus of central university of odisha,sunabeda on epc(epc mode-ibasis)inc.oandm of36 month
Read moreSupply installation testing and commissioning of vrv/vrf central air conditioning system for new logistics control office. mehsana asset.
Supply installation testing and commissioning of vrv/vrf central air conditioning system for new logistics control office. mehsana asset.
Read moreRepair of false ceiling to avoiding ac water leakage, fittings. p/f aluminum partition and other repair work at ground floor ratan tata library at dse complex , university of delhi.
Repair of false ceiling to avoiding ac water leakage, fittings. p/f aluminum partition and other repair work at ground floor ratan tata library at dse complex , university of delhi.
Read moreRmo e and m services installed at karkardooma court complex delhi. (sh annual comprehensive maintenance and operation of daikin make vrv vrf system installed in new court building.)
Rmo e and m services installed at karkardooma court complex delhi. (sh annual comprehensive maintenance and operation of daikin make vrv vrf system installed in new court building.)
Read moreSelection of service provider for comprehensive maintenance for variable refrigerant flow vrf variable refrigerant volume vrv air conditioning system of total 628 hp approx at incubation centre, control and command centre and offices
Selection of service provider for comprehensive maintenance for variable refrigerant flow vrf variable refrigerant volume vrv air conditioning system of total 628 hp approx at incubation centre, control and command centre and offices
Read moreSupply, installation, testing and commissioning of vrf air conditioning system within the mini hall at srijoni auditorium under dmc
Supply, installation, testing and commissioning of vrf air conditioning system within the mini hall at srijoni auditorium under dmc
Read moreOne time repair and replacement of defective parts including shifting of existing outdoor unit of daikin make vrv/vrf system installed in e-sub registrar vi office, kanjhawala, delhi
One time repair and replacement of defective parts including shifting of existing outdoor unit of daikin make vrv/vrf system installed in e-sub registrar vi office, kanjhawala, delhi
Read morePitc and handing over of air conditioning system in basement, ground floor, first floor and fourth floor at divisional library south sector-34 u.t., chandigarh.
Pitc and handing over of air conditioning system in basement, ground floor, first floor and fourth floor at divisional library south sector-34 u.t., chandigarh.
Read moreof your Industry type