Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation And Installation Of Belt Conveyor In E0 District At Chhatarpur Mine No 1, Pathakhera Area, Wcl
|
| Description |
Transportation And Installation Of Belt Conveyor In E0 District At Chhatarpur Mine No 1, Pathakhera Area, Wcl
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_WCL_289771_1 |
|
Reference Number |
PK3550-E-MIN-0055-2023-24 |
| Tender Fee | - |
| EMD | 4500 |
| Tender Value | - |
| Place | OFFICE OF THE STAFF OFFICER MINING GM OFFICE PATHA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 28, 2023 22:30 |
| End Date |
Expired
13/10/2023
Expired 1094 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreProcurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreRemoval of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Removal of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Read morePreparation of marching route for cm package from e1a panel to e0 panel underground at chhatarpur mine no 1, pathakhera area, wcl.
Preparation of marching route for cm package from e1a panel to e0 panel underground at chhatarpur mine no 1, pathakhera area, wcl.
Read moreCrossing of dyke no 3, between e0 and e underground dis-trict in lower workable seam at chhatarpur 1 mine, pathakhera area, wcl
Crossing of dyke no 3, between e0 and e underground dis-trict in lower workable seam at chhatarpur 1 mine, pathakhera area, wcl
Read moreCleaning of travelling roadway at chhatarpur mine no-1, pathakhera area, wcl.
Cleaning of travelling roadway at chhatarpur mine no-1, pathakhera area, wcl.
Read moreDismantling and transportation of haulage trackline from underground to surface at chhatarpur 2 mine, pathakhera area, wcl
Dismantling and transportation of haulage trackline from underground to surface at chhatarpur 2 mine, pathakhera area, wcl
Read moreof your Industry type