Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Over Head Tank Of Capacity 550 Kl And Staging 16.00 Meter In Ward No 27 Khunibad, Kotdwar
|
Description |
Construction Of Over Head Tank Of Capacity 550 Kl And Staging 16.00 Meter In Ward No 27 Khunibad, Kotdwar
|
Organisation | CGM (Drinking Water) Jal Sansthan | State Govt. and UT |
Tender Id | 2025_UKJS_81451_1 |
Reference Number |
3966/Nivida Suchna/dt 04.03.25 |
Tender Fee | 4720 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Kotdwar |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97125 |
Start Date | March 12, 2025 22:30 |
End Date |
18/03/2025 ( Expired 81 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of b.t. road work at bablu patel to aara mashin and mahamaya mandir to tekram masab ward no. 03, barghat
Construction of b.t. road work at bablu patel to aara mashin and mahamaya mandir to tekram masab ward no. 03, barghat
Read moreConstruction of foot over bridge at km.16/550 (karipatti) in salem to ulundurpet section of nh-79 in the state of tamil nadu
Construction of foot over bridge at km.16/550 (karipatti) in salem to ulundurpet section of nh-79 in the state of tamil nadu
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type