Tender Details
Particulars | Details |
---|---|
Title |
Cost Of Maintenance Of Vayals (17) Numbers In Thottamoola Forest Station Of Muthanga Range Under Wayanad Wildlife Division During 2025 26
|
Description |
Cost Of Maintenance Of Vayals (17) Numbers In Thottamoola Forest Station Of Muthanga Range Under Wayanad Wildlife Division During 2025 26
|
Organisation | Forest Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2500 |
EMD | 50000 |
Tender Value | |
Place | Muthanga Range- Thottamoola Forest Station |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 14:30 |
End Date |
23/06/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreSupply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Read moreSupply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Supply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreCwe/chm-26/2025-26 special repair to retaining wall from shakti dwar towards pine marg, mes ib and other technical areas under age b/r i of ge chandimandir at chandimandir mil station
Cwe/chm-26/2025-26 special repair to retaining wall from shakti dwar towards pine marg, mes ib and other technical areas under age b/r i of ge chandimandir at chandimandir mil station
Read moreAAAAAAAAAA
Login to viewMoei fans, rmo booster p/set in the r/o hmps bungalows under ferozshah road sub division-1, ded-201, dg. 2025-26. (sh: replacement of bollard, led fixture ei work at ab-3 purana quila road)
Read moreAssistance in carrying out miscellaneous routine works for prive maintenance of 220kv substation, mahuakheraganj and 132kv substation jaspur under 220kv oandm division, mahuakheraganj
Assistance in carrying out miscellaneous routine works for prive maintenance of 220kv substation, mahuakheraganj and 132kv substation jaspur under 220kv oandm division, mahuakheraganj
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreof your Industry type