Tender Details
Particulars | Details |
---|---|
Title |
Repairing/ Strengthening Of Base Frame Of Drive Assembly (Gearbox, Motor And Drive Drum) Along With Replacement Of Its Coupling Of Unit 801 B Conveyor Belt At Moonidih Coal Washery.
|
Description |
Repairing/ Strengthening Of Base Frame Of Drive Assembly (Gearbox, Motor And Drive Drum) Along With Replacement Of Its Coupling Of Unit 801 B Conveyor Belt At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_330532_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1678 |
Tender Fee | 0 |
EMD | 7900 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342614 |
Start Date | February 28, 2025 14:30 |
End Date |
06/03/2025 ( Expired 93 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Echp-ii- cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure along with the conveyors from 48a b to 68
Echp-ii- cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure along with the conveyors from 48a b to 68
Read more(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
Read moreRepairing overhauling of brake, clutch assembly and radiator of beml make dozer bd-155 si no. g12955 at 5.0mtpa nlw patherdih coal washery.
Repairing overhauling of brake, clutch assembly and radiator of beml make dozer bd-155 si no. g12955 at 5.0mtpa nlw patherdih coal washery.
Read moreMaking placing of precast concrete slab for covering drain along conveyor belt 6a 6b at coal yard with drain cleaning at ktps
Making placing of precast concrete slab for covering drain along conveyor belt 6a 6b at coal yard with drain cleaning at ktps
Read moreSupply erection and commissioning of d.m water pump horizontal split casing along with motor and base plate m.s for clarified water pump house i capacity 94.5 m3 at hr
Supply erection and commissioning of d.m water pump horizontal split casing along with motor and base plate m.s for clarified water pump house i capacity 94.5 m3 at hr
Read more(a) repairing of sprocket drum assembly and its holes and (b) repairing/ fabrication of battery box with suitable locking arrangement of bd-355 dozer sl. no. t-11723, cil no. 3418, model bd-355 at kathara colliery.
(a) repairing of sprocket drum assembly and its holes and (b) repairing/ fabrication of battery box with suitable locking arrangement of bd-355 dozer sl. no. t-11723, cil no. 3418, model bd-355 at kathara colliery.
Read moreRepairing of exhaust tube mounting, air intake unit, manifold and air connection, water housing, front hanger, front and rear drive shaft, exhaust gas re- circulation (egr) valve, egr cooler with its mounting of dumper sl. no. 10344 deployed at topa
Repairing of exhaust tube mounting, air intake unit, manifold and air connection, water housing, front hanger, front and rear drive shaft, exhaust gas re- circulation (egr) valve, egr cooler with its mounting of dumper sl. no. 10344 deployed at topa
Read moreInstallation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Installation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Read moreWork contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.
Work contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.
Read moreRepairing and strengthening of ladders and structure platform of washed power coal bunkers at bhojudih coal washery
Repairing and strengthening of ladders and structure platform of washed power coal bunkers at bhojudih coal washery
Read moreof your Industry type