Tender Details
Particulars | Details |
---|---|
Title |
Laying Of Water Drainage Pipe And Construction Work Of Internal Lane By C.C. From H.No 109/111 To 109/103 And Ward Office To 109/98 Under Ward 37 Zone 4.
|
Description |
Laying Of Water Drainage Pipe And Construction Work Of Internal Lane By C.C. From H.No 109/111 To 109/103 And Ward Office To 109/98 Under Ward 37 Zone 4.
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id | 2025_NNKAN_1014993_1 |
Reference Number |
568/A.A.-4/24-25 |
Tender Fee | 1180 |
EMD | 98568 |
Tender Value | |
Place | H.no-109/111 to 109/103 and ward office to 109/98 |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1863036 |
Start Date | April 22, 2025 16:45 |
End Date |
26/04/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreIn ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
In ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
Read moreMaintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreLaying and jointing of d.i k-7 water pipe line 110 mm dia ward no 03 mohalla shivaji nagar pawan shankar house to sitaram house.
Laying and jointing of d.i k-7 water pipe line 110 mm dia ward no 03 mohalla shivaji nagar pawan shankar house to sitaram house.
Read more06/4
Construction of approach road and other allied works at kultali glr under augmentation of laying distribution system to extend the benefit of 100 p household in zone-i at kultali block within mega surface water based supply scheme of falta-mathurapur
Read moreRequest for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/contractor under regional office,odisha
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/contractor under regional office,odisha
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreof your Industry type