Tender Details
Particulars | Details |
---|---|
Title |
3.3 Cum Containarised Garbage Tipper With Separate Compartment For Dry And Wet Garbage
|
Description |
|
Organisation | Urban Development & Housing Department Bihar | |
Tender Id | GEM/2024/B/4734240 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 05, 2024 01:29 |
End Date |
14/03/2024 ( Expired 436 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreJp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreModification of 112 jaguar aircraft for carriage and launch of hsld mk ii with wireless avionics computer and supply of 15 o level testers
Modification of 112 jaguar aircraft for carriage and launch of hsld mk ii with wireless avionics computer and supply of 15 o level testers
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreProcurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for selected medical college hospitals under medical education and research department govt of assam
Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for &#x0d selected medical college hospitals&#x0d under medical education and research department&#x0d govt of assam&#x0d
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreImplementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Read moreof your Industry type