Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ta For Machining Of Inlet Camshaft For 307 06 4 A,Ta For Machining Of Exhaust Camshaft For 307 21 1 A
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2023/B/3953739 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 15, 2023 20:22 |
| End Date |
Expired
25/09/2023
Expired 1117 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | CEEYES ENGINEERING INDUSTRIES PRIVATE LIMITED | Make : CEEYES Model : CEEYES Title : TA FOR MACHINING OF EXHAUST CAMSHAFT FOR 307- 21-1A (Q3) | 26-09-2023 11:34:59 | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | CEEYES ENGINEERING INDUSTRIES PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) | Item Categories : TA FOR MACHINING OF INLET CAMSHAFT FOR 307-06-4A,TA FOR MACHINING OF EXHAUST CAMSHAFT FOR 307-21-1A | 14022968.96 | L1 |
Camshaft exhaust,camshaft intake,sprocket camshaft,sprocket fip,sprocket crankshaft,chain primary,chain secondary,guide camshaft,fixed guide,arm tensioner primary,arm tensioner secondary,hydraulic tensioner primary,hydraulictensionersecondry,main bearing upper,main bearing lover,kit connecting rod bearing,kit thrust washer set std,kit piston and piston pin,kit piston ring,kit gasket set overhaul,oil filter cartridge,element air filter,water temperature sensor,oil pressure switch,belt,belt,assembly piston cooling jet,assy water pump,valve actuation system,hose assy radiator inlet,hose radiator outlet,kit front cover assembly,ball bearing crankshaft,concentric slave cylinder,threebond,vacuum pump,engine speed sensor,phase sensor,assy thermostat,insulator engine front,pad kit break front,shoe kit lind break,rear styled mudflap lh,rear styled mudflap rh,head lamp bulb,bezel assy gear gaiter high,bush stablizer bar rear,pu bump stop rear,valve intake,valve exhaust,valve guide,valve stem seal,oil seal
Camshaft exhaust,camshaft intake,sprocket camshaft,sprocket fip,sprocket crankshaft,chain primary,chain secondary,guide camshaft,fixed guide,arm tensioner primary,arm tensioner secondary,hydraulic tensioner primary,hydraulictensionersecondry,main bearing upper,main bearing lover,kit connecting rod bearing,kit thrust washer set std,kit piston and piston pin,kit piston ring,kit gasket set overhaul,oil filter cartridge,element air filter,water temperature sensor,oil pressure switch,belt,belt,assembly piston cooling jet,assy water pump,valve actuation system,hose assy radiator inlet,hose radiator outlet,kit front cover assembly,ball bearing crankshaft,concentric slave cylinder,threebond,vacuum pump,engine speed sensor,phase sensor,assy thermostat,insulator engine front,pad kit break front,shoe kit lind break,rear styled mudflap lh,rear styled mudflap rh,head lamp bulb,bezel assy gear gaiter high,bush stablizer bar rear,pu bump stop rear,valve intake,valve exhaust,valve guide,valve stem seal,oil seal
Read moreInlet camshaft forging to drg. no. 307-06-4a to opn no. 10, 30 & 40,exhaust cam shaft forging to dr
Read more
Inlet camshaft forging opn 10, 30 & 40 to drg no 307-06-4a (as per drawings and specifications)
Read more
Inlet camshaft forging opn -10, 30 & 40 to drg no 307-06-4a (as per drawings and specifications)
Read more
Ta in machining of inlet cam shaft opn. no. 50 to 160 to drg. no. 307-06-4a(as per drgs. & specns.
Read more
Exhaust camshaft forging opn 10, 30 & 40 to drg no: 307-21-1a (as per drawings and specifications)
Read more
of your Industry type