Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Laying 1000mm Dia Trenchless Ms Pipe By Jack Pushing Method For Crossing On Swaroop Nagar Road, Amrit Vihar Main Burari Road And Avtar Singh Marg.
|
| Description |
Providing And Laying 1000mm Dia Trenchless Ms Pipe By Jack Pushing Method For Crossing On Swaroop Nagar Road, Amrit Vihar Main Burari Road And Avtar Singh Marg.
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2025_PWD_272572_1 |
|
Reference Number |
23/EE/C and ND-R/PWD/2025-26 |
| Tender Fee | 0 |
| EMD | 1.49 Lakh |
| Tender Value | - |
| Place | Sub. Division-1 |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=358150 |
| Start Date | May 21, 2025 23:20 |
| End Date |
Expired
28/05/2025
Expired 508 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)
Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)
Read moreRailway track crossing by pipe pushing method at km/tp-66/27-29 and km/tp-66/28-30 between stations mxy and dxn of east central railway (bomb minor at km. 2.925) and km/tp-64/29-31 and km/tp-64/30-32 between stations mxy and wdm of east central railw
Railway track crossing by pipe pushing method at km/tp-66/27-29 and km/tp-66/28-30 between stations mxy and dxn of east central railway (bomb minor at km. 2.925) and km/tp-64/29-31 and km/tp-64/30-32 between stations mxy and wdm of east central railw
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreUg cable trenchless method at kalipalayam feeder somanur railway track crossing
Execution of ug cable trenchless method work for laying of 3 400 sqmm ht cable 2 run for shifting of existing 33 kv kalipalayam feeder oh line at km 460 11 13 smr railway track crossing in tn smr section
Read moreLaying and pushing 610 mm dia pipe fe-410 grade ms pipe crossing by adopting trenchless technologies (e.g. jack pushing method etc.) of 250mm rising main line for amritnagar zone-ii water supply scheme between station nimcha raniganj at km 197/21b-23
Laying and pushing 610 mm dia pipe fe-410 grade ms pipe crossing by adopting trenchless technologies (e.g. jack pushing method etc.) of 250mm rising main line for amritnagar zone-ii water supply scheme between station nimcha raniganj at km 197/21b-23
Read morePipe line crossing by adopting trench less technologies (e.g. jack pushing method etc), under dmc area (only forassessmentofrates of non schedule items)
Pipe line crossing by adopting trench less technologies (e.g. jack pushing method etc), under dmc area (only forassessmentofrates of non schedule items)
Read moreLaying of sewer line by open cut method in malakrajarea and by trenchless method under railway crossing between malakraj and bairahana
Laying of sewer line by open cut method in malakraj area and by trenchless method under railway crossing between malakraj and bairahana
Read more1085 - estimate for various sewer line crossing by trenchless method at national highway in mc sonipat
1085 - estimate for various sewer line crossing by trenchless method at national highway in mc sonipat
Read moreof your Industry type