Tender Details
Particulars | Details |
---|---|
Title |
Retender Deposit Urgent Restoration Works To Alumkadavu Alumpeedika Road Both Rhs And Lhs Urgent Restoration Alumpeedika Road Ch 0/000 To 4/000 Both Lhs And Rhs General Civil Work
|
Description |
Retender Deposit Urgent Restoration Works To Alumkadavu Alumpeedika Road Both Rhs And Lhs
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_741781_1 |
Reference Number |
PWD/RB/TR/10204/2024 |
Tender Fee | 555 |
EMD | 2868 |
Tender Value | |
Place | Karunagappally |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1220813 |
Start Date | March 19, 2025 21:30 |
End Date |
25/03/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreWidenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Read moreFormation of 4th main road (ch 0 -000 to 0-420) from marudhar rocks company to bhasaveswar temple including storm water drain, culverts in sipcot industrial park, hosur (phase ii, expansion i and ii)
Formation of 4th main road (ch 0 -000 to 0-420) from marudhar rocks company to bhasaveswar temple including storm water drain, culverts in sipcot industrial park, hosur (phase ii, expansion i and ii)
Read moreCovered drain and interlocking road construction work from street no. 0-l-5 turn in ward no. 05 sahadatpura east via pradeep singh house to barpur pitch road via maurya general store.
Covered drain and interlocking road construction work from street no. 0-l-5 turn in ward no. 05 sahadatpura east via pradeep singh house to barpur pitch road via maurya general store.
Read moreMaintenance of road from mayur gate to byepass road (l_1 km)_portion from ch 0 km to ch 0point10 km (l_0point10 km) under bmc ward no iii during the year 2025_26
Sh_flat brick soling, edge soling, wbm iii, grouting, carpeting, recarpeting, brick masonry work, road side pucca drain and other ancillary works (group_i)
Read moreFdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Fdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Read moreImprovement and widening of slapper tattapani road km 0/0 to 68/0
Rofd, m/t, r/wall, b/wall, c.d. works, metal beam crash barrier, road marking, road furniture and dumping sites etc. for intermediate lane portion km 20/500 to 31/300) actual length 32/385.
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreof your Industry type