Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Rcc Pedestal (118 Nos) For 500 Mm Dia Ms Pipe Line Total Length 530 Mtr (From Ganchha Minor 1 Reach 1770 Mtr To 2050 Mtr And From 2150 Mtr To 2400 Mtr) In Main Canal Of New Ramjanki Pump Canal
|
Description |
Construction Of Rcc Pedestal (118 Nos) For 500 Mm Dia Ms Pipe Line Total Length 530 Mtr (From Ganchha Minor 1 Reach 1770 Mtr To 2050 Mtr And From 2150 Mtr To 2400 Mtr) In Main Canal Of New Ramjanki Pump Canal
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2025_UPIDM_994589_1 |
Reference Number |
09/Lot5/EE/MLCDBanda/2024-25 |
Tender Fee | 854 |
EMD | 64000 |
Tender Value | |
Place | Ganchha, Banda |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1761289 |
Start Date | January 18, 2025 18:05 |
End Date |
28/01/2025 ( Expired 144 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of one no. 6 in dia ms pipe delivery line 600 mtr. from 23bdip 10l to 23bdip 1l, and then to 25d 1l through inclined, along with installation of two no s of goalposts for a newly installed pump of 23b dip in underground at mic, jpc
Installation of one no. 6 in dia ms pipe delivery line 600 mtr. from 23bdip 10l to 23bdip 1l, and then to 25d 1l through inclined, along with installation of two no s of goalposts for a newly installed pump of 23b dip in underground at mic, jpc
Read moreCo wss for kufru mohal gp bihun in tehsil joginder nagar district mandi h.p sh co rcc intake chamber at kufru nallah and laying, jointing and testing of ppr pipe of 25 mm dia from rd from rd 0 to 500 500 rmt at kufru village dc deposit
Co wss for kufru mohal gp bihun in tehsil joginder nagar district mandi h.p sh co rcc intake chamber at kufru nallah and laying, jointing and testing of ppr pipe of 25 mm dia from rd from rd 0 to 500 500 rmt at kufru village dc deposit
Read moreLaying of 110 mm hdpe pipe line from chairman sahab furniture store to master nandram house mohalla kila bharat nagar length 640 mtr./dr. rizwan house to jahir house mohalla hasanpura length 330 mtr total length 970 mtr. kiratpur.
Laying of 110 mm hdpe pipe line from chairman sahab furniture store to master nandram house mohalla kila bharat nagar length 640 mtr./dr. rizwan house to jahir house mohalla hasanpura length 330 mtr total length 970 mtr. kiratpur.
Read moreLaying of 110 mm dia pvc pipe line 155 mtr long from h.no-12/518 to main road near ahirana gwaltoli, ward-4, kanpur
Laying of 110 mm dia pvc pipe line 155 mtr long from h.no-12/518 to main road near ahirana gwaltoli, ward-4, kanpur
Read moreLaying of 110 mm, 160 mm, 200 mm 250 mm dia p.v.c pipe line from main line pothuraju canal bridge to gandhi nagar 1st line along guntur road distribution lines to nehru nagar gandhi nagar lines in division no.50
Laying of 110 mm, 160 mm, 200 mm 250 mm dia p.v.c pipe line from main line pothuraju canal bridge to gandhi nagar 1st line along guntur road distribution lines to nehru nagar gandhi nagar lines in division no.50
Read moreRepairing of ms pipe line 200 mm dia. from river bed pump to chp of hloc mine , hlsa including soil excavation and replacement of damaged pipe.
Repairing of ms pipe line 200 mm dia. from river bed pump to
 chp of hloc mine , hlsa including soil excavation and
 replacement of damaged pipe.
Read more692 -providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
692 -providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreProviding and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
Providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
Read moreConstruction of rcc pedastal from p97 to p174 for 800 mm dia ms pipe. from chainage 2830 m to 3180 m at main pipe line lot 2
Construction of rcc pedastal from p97 to p174 for 800 mm dia ms pipe. from chainage 2830 m to 3180 m at main pipe line lot 2
Read moreof your Industry type