Tender Details

Particulars Details
Title
Obr Work At Rg Oc Ii Extension Project, Rg Iii Area
Description
Drilling, Excavation, Loading, Transportation, Dumping, Spreading And Levelling, Etc., Of 673.56 Lbcm Of In Situ Ob (Which Includes 5.60 Lbcm Of Top Soil, 657.02 Lbcm Of Hard Ob And 10.94 Lbcm Of Coal) With Conventional Equipment, And Additional Works Viz., 1500 Shovel Hours, 1500 Dozer Hours And 1,10,000 Rmt Of Drilling At Rg Oc Ii Extension Project, Rg Iii Area During A Period Of 36 Months.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 611498
Reference
Number
E1125O0107
Tender Fee 29500
EMD 1 Crore
Tender Value -
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date July 22, 2025 20:30
End Date
Expired 29/07/2025

Expired 420 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Supply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.

Supply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n

Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.

Read more
Obr work at rg ocp-iii mine (phase-ii), rg-ii area.

Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 602.58 lbcm of in-situ ob (which includes 4.08 lbcm of top soil, 569.92 lbcm of hard ob 28.58 lbcm of coal) and re-handling of 15.28 lcm of top soil with conventional equipment and additional works viz., 3,000 rmt of drilling at rg ocp-iii mine (phase-ii), rg-ii area during a period of 36 months.

Read more
Construction of rock toe wall around external dumps of rg oc-ii extension project at rg-iii area.

Construction of rock toe wall around external dumps of rg.oc-ii extension project at rg-iii area, godavarikhani, peddapalli dist., telangana state. (invited under earmarked works - contractors belonging to waddera/sagara/uppara community only are eligible)

Read more
Obr work at srp oc-ii expansion project mine.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 604.877 lbcm of in-situ ob (which includes 4.323 lbcm of top soil, 12.212 lbcm of sub soil, 2.866 lbcm of bc soil, 567.257 lbcm of hard ob and 18.219 lbcm of coal) and re-handling of 1.491 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 4000 dozer hours and 1,94,000 rmt of drilling at srp oc-ii expansion project mine, srirampur area during a period of 36 months.

Read more
Obr work at jvr oc-ii mine, kgm area.

Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 573.798 lbcm of in-situ ob (which includes 1.179 lbcm of top soil, 3.279 lbcm of sub soil, 526.304 lbcm of hard ob 43.036 lbcm of coal) and re-handling of 11.385 lcm of loose ob with conventional equipment and additional works viz., 2000 shovel hours 1,65,000 rmt of drilling at jvr oc-ii mine, kgm area during a period of 36 months.

Read more
Obr work at ktk opencast-ii project, bhupalpalli area.

Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 435.740 lbcm of in-situ ob (which includes 2.40 lbcm of top soil, 2.40 lbcm of sub soil, 408.198 lbcm of hard ob 22.742 lbcm of coal), excavation of 15.022 lbcm of in-situ ob with ripper shovel, re-handling of 24.510 lcm of loose top soil and re-handling of 5.00 lcm of loose ob with conventional equipment, and additional works viz., 1000 shovel hours, 500 dozer hours 3,36,000 rmt of drilling at ktk opencast-ii project, bhupalpalli area during a period of 36 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise