Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Setting Up Of 200 Mw Solar Pv Power Project In 600 Mw In Solar Park (Stage 1) Of Gujarat State Electricity Corporation Ltd.(Gsecl) At Khavda, Gujarat.
|
| Description |
Setting Up Of 200 Mw Solar Pv Power Project In 600 Mw In Solar Park (Stage 1) Of Gujarat State Electricity Corporation Ltd.(Gsecl) At Khavda, Gujarat.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_NHPC_760763_1 |
|
Reference Number |
NH/CCW/CC-III/CO-258/PR16923/8 dated 28.06.2023 |
| Tender Fee | 20000 |
| EMD | 9.2 Crore |
| Tender Value | - |
| Place | NHPC Office Complex, Faridabad. |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | August 22, 2023 16:30 |
| End Date |
Expired
18/12/2023
Expired 1035 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - pw 142 the work of vibration analysis of boiler and turbine auxiliaries for 200 210 mw units at gsecl ukai tps bmd 2 as per schedule b and scope of work mentioned in at..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - pw 142 the work of vibration analysis of boiler and turbine auxiliaries for 200 210 mw units at gsecl ukai tps bmd 2 as per schedule b and scope of work mentioned in at..
Read moreRfs for selection of solar power developer for setting up 100 mw grid connected floating solar power project
Rfs for selection of solar power developer for setting up 100 mw grid connected floating solar pv power project at tansa and/or modak sagar dam on design-finance-build-own-operate-transfer through tariff based competative bidding process.
Read moreEt-6387 hydraulic comparision tester - 0 to 600 bar,hydraulic comparision tester - 0 to 350 bar,automated pressure controller for pressure calibration
Et-6387 hydraulic comparision tester - 0 to 600 bar,hydraulic comparision tester - 0 to 350 bar,automated pressure controller for pressure calibration
Read moreComplete actuator sub assembly 38 18 8a without accessories make mil 38 41932 8 ansi 2500 cv 250 actuator size 18 8a,complete actuator sub assembly 38 18 6a3 without accessories make mil 38 41421 3 ansi 2500 cv 65 actuator size 18 6a3,complete actuator sub assembly 38 13 6a2 without accessories make mil 38 41632 2 ansi 600 cv 50 actuator size 13 6a2,complete actuator sub assembly 38 13 6a2 without accessories make mil 38 41121 1.5 ansi 600 cv 10 actuator size 13 6a2,complete actuator sub assembly 38 15 6a3 without accessories make mil 38 41112 2 ansi 600 cv 20 actuator size 15 6a3,complete actuator sub assembly 38 13 6a2 without accessories make mil 38 41112 1.5 ansi 600 cv 8 actuator size 13 6a2
Complete actuator sub assembly 38 18 8a without accessories make mil 38 41932 8 ansi 2500 cv 250 actuator size 18 8a,complete actuator sub assembly 38 18 6a3 without accessories make mil 38 41421 3 ansi 2500 cv 65 actuator size 18 6a3,complete actuator sub assembly 38 13 6a2 without accessories make mil 38 41632 2 ansi 600 cv 50 actuator size 13 6a2,complete actuator sub assembly 38 13 6a2 without accessories make mil 38 41121 1.5 ansi 600 cv 10 actuator size 13 6a2,complete actuator sub assembly 38 15 6a3 without accessories make mil 38 41112 2 ansi 600 cv 20 actuator size 15 6a3,complete actuator sub assembly 38 13 6a2 without accessories make mil 38 41112 1.5 ansi 600 cv 8 actuator size 13 6a2
Read moreHiring of consultants - milestone/deliverable based - management consultants, appointment of consultant for the work of feasibility study for up 800 mw and above capacity coal based supercritical ultra supercritical thermal power project at exist..,hiring of consultants - milestone/deliverable based - management consultants, appointment of consultant for the work of preparation of detail project report dpr for up 800 mw and above capacity coal based supercritical ultra supercritical thermal..
Hiring of consultants - milestone/deliverable based - management consultants, appointment of consultant for the work of feasibility study for up 800 mw and above capacity coal based supercritical ultra supercritical thermal power project at exist..,hiring of consultants - milestone/deliverable based - management consultants, appointment of consultant for the work of preparation of detail project report dpr for up 800 mw and above capacity coal based supercritical ultra supercritical thermal..
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - wt 5264 g rate contract for works of complete servicing overhauling attending fault repairing checking of various types of hoists and cranes of 500 mw unit 6 ukai tps..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt 5264 g rate contract for works of complete servicing overhauling attending fault repairing checking of various types of hoists and cranes of 500 mw unit 6 ukai tps..
Read moreHiring of consultants - milestone/deliverable based - management consultants, revalidation of existing detailed feasibility report (dfr) and integration of bess with floating solar projects dpr,rfp preparation & bid process management, subject matte..,hiring of consultants - milestone/deliverable based - management consultants, feasibility report of bess project co-located with ing thermal and solar plant dpr,rfp preparation & bid process management, subject matter expert yes hybrid(as spec..
Hiring of consultants - milestone/deliverable based - management consultants, revalidation of existing detailed feasibility report (dfr) and integration of bess with floating solar projects dpr,rfp preparation & bid process management, subject matte..,hiring of consultants - milestone/deliverable based - management consultants, feasibility report of bess project co-located with ing thermal and solar plant dpr,rfp preparation & bid process management, subject matter expert yes hybrid(as spec..
Read moreEoi for empanelment of vendors- solar pv system with battery energy storage system - site survey, design, engineering, supply, installation, testing and commissioning and 10 years of o and m of grid-connected rooftop solar pv system.
Eoi for empanelment of vendors and rate contract under two-bid system for site survey, design, engineering, supply, installation, testing, commissioning and comprehensive operation an maintenance for 10 years
Read moreNit no. wbsedcl/spgd/ jungle sundari karmanagari ii/solar pv and bess project /2026-27/nit-89 date 12.10.2026
Design, engineering, procurement, supply, installation, construction, testing and commissioning incl warrantee obligation, o and m for 12 yr of a 50 mw ac solar pv power plant and 10 mw/ 40 mwh bess located at jungle sundari, purulia district, wb
Read moreof your Industry type