Tender Details

Particulars Details
Title
Suprapatellar Nail For Tibia With 5 Locking Bolts
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/3975123
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date November 08, 2023 15:37
End Date
Expired 29/11/2023

Expired 1004 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 2 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 SKY SURGICALS Make : SKY SURGICALS Model : Suprapatellar Nail For Tibia With 5 Locking Bolts Title : Suprapatellar Nail For Tibia With 5 Locking Bolts 21-11-2023 12:58:40 MII MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 SKY SURGICALS(MSE,MII)( MSE Social Category:General ) Item Categories : Suprapatellar Nail for Tibia with 5 locking bolts 85000.00 L1
Similar Tenders
Supply of new mahindra bolero pik-up 2.0 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.

Supply of new mahindra bolero pik-up 2.0 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.

Read more
Procurement of 350hp submersible pump set complete along with cmc for 5 years after warranty. in division no:corp-mp.

Procurement of 350hp submersible pump set complete along with cmc for 5 years after warranty. in division no:corp-mp.

Read more
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years.(group-02)

Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years.(group-02)

Read more
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee

Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Design, build, construct, install adn commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee.

Design, build, construct, install adn commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee.

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)

Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.

Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.

Read more
Supply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5.

Supply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5- scope of work as per tender document.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise