Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 07 Nos. Drive Head Foundation, 02 Nos Haulage Foundation, 02 No Ug Sub Station At Cm Panel 7 Ls, 6 D, 17 D, 25 D, 17 Ls And 23 Ls Dev. Distt. Of 4 A Seam, Ii) Construction Of 01 No. Over Bridge At 4 L/2 R 06 Nos. Retaining Walls In C
|
Description |
Construction Of 07 Nos. Drive Head Foundation, 02 Nos Haulage Foundation, 02 No Ug Sub Station At Cm Panel 7 Ls, 6 D, 17 D, 25 D, 17 Ls And 23 Ls Dev. Distt. Of 4 A Seam, Ii) Construction Of 01 No. Over Bridge At 4 L/2 R 06 Nos. Retaining Walls In C
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_310048_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/24-25/13 dtd 09.06.2024 |
Tender Fee | 0 |
EMD | 95000 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321252 |
Start Date | June 10, 2024 23:30 |
End Date |
01/07/2024 ( Expired 321 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreConstruction of (i) 22 nos rcc sectionalization stoppings to sectionalize 55lw,50lw,45lw, 38lw proposed cm panel and (ii) construction of 12 nos. rcc retaining walls in 55lw,50lw,45lw , 38lw proposed cm panel in v top seam of baherabandh ug mine of
Construction of (i) 22 nos rcc sectionalization stoppings to sectionalize 55lw,50lw,45lw, 38lw proposed cm panel and 
 (ii) construction of 12 nos. rcc retaining walls in 55lw,50lw,45lw , 38lw proposed cm panel in v top seam of baherabandh ug mine of
Read moreConstruction of 02 nos. haulage foundation for proposed stowing panel s7 in rviii (bottom) seam of no. 1 incline of bankola colliery
Construction of 02 nos. haulage foundation for proposed stowing panel s7 in rviii (bottom) seam of no. 1 incline of bankola colliery
Read moreConstruction of 12 nos rcc sectionalisation stoppings to isolate 90lw lhd panel 96 dip cm panel(ii) construction of 02 nos.rcc retaining wall and 02 nos. rcc protective pillars in 90lw lhd panel in v top seam of baherabandh ug mine of hasdeo area.
Construction of 12 nos rcc sectionalisation stoppings to isolate 90lw lhd panel 96 dip cm panel(ii) construction of 02 nos.rcc retaining wall and 02 nos. rcc protective pillars in 90lw lhd panel in v top seam of baherabandh ug mine of hasdeo area.
Read moreConstruction of 02 nos. rcc temporary retaining wall in 12 east panel in masan combined seam and construction of 01 nos. pumping station/ plateform at 12 east panel/ main dip for installation of ht. pump at shiwani ug mine under bhatgaon area.
Construction of 02 nos. rcc temporary retaining wall in 12 east panel in masan combined seam and construction of 01 nos. pumping station/ plateform at 12 east panel/ main dip for installation of ht. pump at shiwani ug mine under bhatgaon area.
Read moreConstruction of 44 nos. ventilation stopping with fly ash bricks in proposed depillaring panel no. 4j-8 in 4a seam at jhiria ug mine.
Construction of 44 nos. ventilation stopping with fly ash bricks in proposed depillaring panel no. 4j-8 in 4a seam at jhiria ug mine.
Read moreConstruction of 07 nos. drive head foundation, 02 nos haulage foundation, 02 no ug sub station at cm panel 7ls, -6d, -17d, -25d, -17ls and 23ls dev. distt. of 4a seam, ii) construction of 01 no. over bridge at 4l/2r 06 nos. retaining walls in c
Construction of 07 nos. drive head foundation, 02 nos haulage foundation, 02 no ug sub station at cm panel 7ls, -6d, -17d, -25d, -17ls and 23ls dev. distt. of 4a seam, ii) construction of 01 no. over bridge at 4l/2r 06 nos. retaining walls in c
Read moreConstruction of 07 nos of 50cm thick retaining wall in 34ln panel in seam a at kurja ug mine.
Construction of 07 nos of 50cm thick retaining wall in 34ln panel in seam a at kurja ug mine.
Read moreConstruction of 51 nos. rcc isolation stoppings in proposed panel no. 4j-7(sub panel no. 4j-7a and sub panel no. 4j-7b) of 4a seam and sealing between sub panels 4j-7a and 4j-7b) of 4a seam at jhiria ug mine.
Construction of 51 nos. rcc isolation stoppings in proposed panel no. 4j-7(sub panel no. 4j-7a and sub panel no. 4j-7b) of 4a seam and sealing between sub panels 4j-7a and 4j-7b) of 4a seam at jhiria ug mine.
Read moreConstruction of 02 nos. air crossings at -2d/3l and -2d/4l for circuit of cm panel trunk road t1 in r-v seam at mic under jpc
Construction of 02 nos. air crossings at -2d/3l and -2d/4l for circuit of cm panel trunk road t1 in r-v seam at mic under jpc
Read moreof your Industry type