Tender Details

Particulars Details
Title
Raising Height Of Barvi Dam Rehabilitation Of Work Providing Barricadding To Approch Road Of Old Villages And Downstrem Side Of Barvi Dam River.
Description
Raising Height Of Barvi Dam Rehabilitation Of Work Providing Barricadding To Approch Road Of Old Villages And Downstrem Side Of Barvi Dam River.
Organisation Maharashtra Industrial Development Corporation | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 6400
EMD 7400
Tender Value
Place Rehabilitation Gaothan
Link

AAAAAAAAAA

Login to view
Start Date July 02, 2025 23:30
End Date

08/07/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Stmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29

Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Demolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars with covered roofing at eastern side of tatra hangar for parking area

Demolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars&#x0d with covered roofing at eastern side of tatra hangar for parking area

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160

Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160

Read more
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar

Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar

Read more
Old nh 34 road - stregthening work

Old nh 34 road - stregthening work - from 95.10 kmp to 97.80 kmp and 111.90 kmp to 112.40 kmp effective length - 2310.00 m under nadia division, p.w.d. in the district of nadia, west bengal

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of tulawati rest house, r.c.c. ramp ,drain, patch repairing work at existing c.c. road at new mandi yard and construction of compound wall, maintenance and painting work of trolly shed at old mandi yard ashoknager

Construction of tulawati rest house, r.c.c. ramp ,drain, patch repairing work at existing c.c. road at new mandi yard and construction of compound wall, maintenance and painting work of trolly shed at old mandi yard ashoknager

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise