Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ambalappattu Devaswom In Mavelikkara Group Proposed Stage Foundation Reg.Retender
|
| Description |
Ambalappattu Devaswom In Mavelikkara Group Proposed Stage Foundation Reg.Retender
|
| Organisation | Travancore Devaswom Board | State Govt. and UT |
| Tender Id | 2024_TDB_697107_1 |
|
Reference Number |
EEM/ET-119/2024-25 |
| Tender Fee | 885 |
| EMD | 9400 |
| Tender Value | - |
| Place | Mavelikkara |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1087253 |
| Start Date | October 16, 2024 23:30 |
| End Date |
Expired
21/10/2024
Expired 686 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Group no-01 construction of drain in ward no. 31 gaurakshini gaushala.
Group no-01 construction of drain in ward no. 31 gaurakshini gaushala.
Read moreProvision of approach road, pcc flooring and gate foundation for proposed automatic gate system at the entry point of coal rake between andal railway siding, west bengal to dstps, dvc plant siding.
Provision of approach road, pcc flooring and gate foundation for proposed automatic gate system at the entry point of coal rake between andal railway siding, west bengal to dstps, dvc plant siding.
Read moreConstruction of proposed toilet complex in the campus of anumandal civil court hilsa in dist-nalanda for the year-2026-27
Construction of proposed toilet complex in the campus of anumandal civil court hilsa in dist-nalanda for the year-2026-27
Read moreConstruction of 07 nos isolation stopping at 15le proposed lhcm panel of seam ii in pandavpara mine
Construction of 07 nos isolation stopping at 15le proposed lhcm panel of seam ii in pandavpara mine
Read moreGroup no-02 construction of drain with cover from devi sthan to arun kumar's house in ward no. 7.
Group no-02 construction of drain with cover from devi sthan to arun kumar's house in ward no. 7.
Read moreGroup no-03 construction of drain and path from nagina pustak to transformer via ramugraha singh's house in ward no. 09.
Group no-03 construction of drain and path from nagina pustak to transformer via ramugraha singh's house in ward no. 09.
Read moreProposed road development work at sai layout 1st cross and 3rd main road mahamaye house to shri hari house and silver park 1st main road and 2nd cross road in ward 41
Proposed road development work at sai layout 1st cross and 3rd main road mahamaye house to shri hari house and silver park 1st main road and 2nd cross road in ward 41
Read moreEstablishing 2x20mva, 110/11kv sub-station at adakalabandi (kodala) and construction of 110kv dc line using panther conductor from existing 110kv gondadagi sub-station to the proposed 110/11kv sub-station at adakalabandi(kodala) for a distance of about 7.907km in wadagera taluk, yadgir district
Establishing 2x20mva, 110/11kv substation at adakalabandi(kodala) along with construction of 110kv dc line from existing 110kv gondadagi substation to proposed 110/11kv adakalabandi sub-station for a distance of 7.907 kms and construction of 2nos of terminal bay at 110kv gongadagi substation in wadegera taluk, yadgir district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning
Read moreAmbalappattu devaswom in mavelikkara group proposed stage foundation reg
Ambalappattu devaswom in mavelikkara group proposed stage foundation reg
Read morePathiyoor devaswom in mavelikkara group proposed a new navaham and navarathry pandal-reg.retender
Pathiyoor devaswom in mavelikkara group proposed a new navaham and navarathry pandal-reg.retender
Read moreof your Industry type