Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Carriage Of Damaged Transformer From Site To Store Bsr And Repaired Transformer From Store Bsr To Site In The Area Of Sdo Ii Gulaothi And Iii Sikandrabad Under Edd I Bulandshahr.
|
Description |
Carriage Of Damaged Transformer From Site To Store Bsr And Repaired Transformer From Store Bsr To Site In The Area Of Sdo Ii Gulaothi And Iii Sikandrabad Under Edd I Bulandshahr.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_PVVNL_819547_1 |
Reference Number |
21/EDC-II/BSR/2023-24 |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | EDC 2 BULANDSHAHR |
Link | https://etender.up.nic.in |
Start Date | July 11, 2023 23:30 |
End Date |
21/07/2023 ( Expired 696 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreRepair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Read moreCs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Cs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreRepairs to hardstanding, path, interlocking tiles, chequered tiles, perimeter compound wall, security fencing, barbed wire, security gates, baby wall, temproary sheds at various loc of nad expl, non expl and tunir area under age b/r-ii at ns karanja
Repairs to hardstanding, path, interlocking tiles, chequered tiles, perimeter compound wall, security fencing, barbed wire, security gates, baby wall, temproary sheds at various loc of nad expl, non expl and tunir area under age b/r-ii at ns karanja
Read moreRepair and roof treatment wc stacks, rwp, plastering, sunken treatment etc in md accn and repair to parapets, shafts, sunken floor of dbn mess, auditorium, vtc, ib, jsi, pepps school etc under age b/r-ii at ge gurdaspur
Repair and roof treatment wc stacks, rwp, plastering, sunken treatment etc in md accn and repair to parapets, shafts, sunken floor of dbn mess, auditorium, vtc, ib, jsi, pepps school etc under age b/r-ii at ge gurdaspur
Read moreof your Industry type