Tender Details
Particulars | Details |
---|---|
Title |
General Maintenance Work At Hilly Aqua Aruvikkara Manufacturing, Supply, Installation ,Trial Running And Commissioning Of Fully Automatic Prefiltration System At Hilly Aqua Packaged Drinking Water Plant Aruvikkara General Civil Work
|
Description |
Installing Fully Automatic Prefiltration System At Hilly Aqua Packaged Drinking Water Plant Aruvikkara
|
Organisation | Kerala Irrigation Infra Devlp Corp Ltd | State Govt. and UT |
Tender Id | 2024_KIIDC_685268_1 |
Reference Number |
IRR/KIIDC/478/2024-2025 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Aruvikkara |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1066362 |
Start Date | August 12, 2024 23:30 |
End Date |
30/08/2024 ( Expired 286 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Read moreSupply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Supply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreSupply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Supply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Read more2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
Read moreSupply installation commissioning and testing of 4 tph fully automatic rice mill machinery
Supply installation commissioning and testing of 4 tph fully automatic rice &#x0d mill machinery
Read moreInstallation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx
Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx
Read moreSupply installation testing commissioning of 700 kwp grid tied rooftop solar pv system and five year maintenance
Supply installation testing commissioning of 700 kwp grid tied rooftop solar pv system and five-year maintenance
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreof your Industry type