Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Moil Limited Requires Expertise In Excavation 🛠️ Moil Limited, Under The Ministry Of Steel, Is Seeking Proposals For An Additional Excavation Project At The Minus 370 Ft Level From Chainage (Ch) 2070 To Chainage (Ch) [Details Omitted], Within The Specified Timeframe. 🗓️ Deadline: May 20, 2024, 1:00 Pm Interested Bidders Should Possess The Necessary Technical Expertise And Equipment To Undertake Excavation Work In Rock Conditions At Significant Depths. Proposals Must Include Detailed Methodologies, Safety Plans, And Cost Estimates. Keywords: Moil Limited, Excavation, Rock, Mining, Government Contract, Procurement, Bid Submission| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Additional Excavation In Rock At Minus 370 Ft Level From Ch 2070 To Ch
|
| Description |
|
| Organisation | MOIL Limited | Ministry of Steel |
| Tender Id | GEM/2024/B/4896391 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 29, 2024 17:41 |
| End Date |
Expired
20/05/2024
Expired 874 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
SS Mining
6177300
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A. A. PASHA | 20-05-2024 11:59:34 | MSE | MSE | Qualified |
| 2 | B R HULDE | 19-05-2024 15:15:51 | Registered with designated Agency / Authority | MSE | Qualified |
| 3 | M N SAMBARE | 19-05-2024 12:14:43 | Registered with designated Agency / Authority | MSE | Qualified |
| 4 | MD. A .I .SHEIKH | 19-05-2024 19:36:32 | MSE | MSE | Qualified |
| 5 | SALASAR ASSOCIATES | 20-05-2024 09:05:21 | Registered with designated Agency / Authority | MSE | Disqualified |
| 6 | SIBI BABU VARGHESE | 19-05-2024 18:50:23 | Registered with designated Agency / Authority | MSE | Qualified |
| 7 | SS Mining | 19-05-2024 13:24:32 | MSE | MSE | Qualified |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Custom Bid for Services - Additional Excavation in Rock at minus 370 ft Level from Ch 2070 to Ch 2310 at Chikla Main section of Chikla Mine quantity as per tender document | Custom Bid for Services | 1 | ₹ 6177300.000 |
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreCustom bid for services - additional excavation in rock at minus 370 ft level from ch 2070 to ch
Read more
Custom bid for services - additional excavation in manganiferous rock at minus 370 ft level at chik
Read more
Custom bid for services - additional excavation in rock at minus 370 ft level at chikla main sect
Read more
Custom bid for services - additional excavation in rock at minus 370 ft level at chikla main sect
Read more
Custom bid for services - additional excavation in rock at minus 370 ft level of chikla mine quanti
Read more
of your Industry type