Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Air Brake System Indicators For Lhb Coaches 🛤️🚂 The Ministry Of Railways, Central Government, Invites Bids For The Supply Of Indicators For The Air Brake System Of Lhb Coaches. 🛠️ 📅 Bid Submission Deadline: April 26, 2024, 11:00 Am Emd: Inr 61,170 Interested Bidders Are Advised To Refer To The Tender Document For Complete Specifications And Submission Guidelines. This Is A Significant Opportunity For Suppliers To Contribute To The Safety And Efficiency Of India's Railway System. Keywords: Ministry Of Railways, Air Brake System Indicators, Lhb Coaches, Procurement, Government Tender, Safety Equipment, Railway System| Particulars | Details |
|---|---|
| Title |
Indicator For Air Brake System Of Lhb Coaches
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106264921 |
|
Reference Number |
07231943 |
| Tender Fee | 0 |
| EMD | 61170 |
| Tender Value | |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/042024/106264921/viewNitPdf_4481378.pdf |
| Start Date | February 13, 2024 20:36 |
| End Date |
Expired
26/04/2024
Expired 819 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Poh kit for escorts make pneumatic brake controller etc.
For complete deion and other details, please refer to tender
Read moreAugmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreExpression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Read moreProcurement of control interface module (cim) for 20 cum er shovel
Procurement of control interface module (cim) for 20 cum er shovel
Read moreDesign, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type