Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Procurement Opportunity: Sand Transportation Services 🚛 Indian Rare Earths Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Accumulation, Loading, And Transportation Of Mining Output Sand From Designated Areas. 🏗️ 📅 Bid Submission Deadline: April 4, 2024, 2:00 Pm The Earnest Money Deposit (Emd) Is Set At Inr 171,000. Interested Bidders Must Submit Detailed Proposals, Including Methodologies, Equipment Specifications, And Cost Breakdowns, By The Stipulated Deadline. Keywords: Mining Output Sand, Transportation Services, Indian Rare Earths Limited, Central Government, Procurement, Emd, Bid Submission| Particulars | Details |
|---|---|
| Title |
Accumulation, Loading And Transportation Of Mining Output Sand From Mining Areas
|
| Description |
Accumulation, Loading And Transportation Of Mining Output Sand From Mining Areas
|
| Organisation | Indian Rare Earths Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_IRELD_750164_1 |
|
Reference Number |
GEM/2024/B/4749643 Dated- 14/03/2024 |
| Tender Fee | 0 |
| EMD | 1.71 Lakh |
| Tender Value | - |
| Place | IREL(India)Limited, OSCOM, Matikhalo |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1053394 |
| Start Date | March 14, 2024 19:40 |
| End Date |
Expired
04/04/2024
Expired 920 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.
Hiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreHandling and transport on lumpsum basis - accumulation loading and transportation of mining output
Read more
Accumulation, loading and transportation of mining output sand from different locations of mining site and unloading of the same at rpa site
Accumulation, loading and transportation of mining output sand from different locations of mining site and unloading of the same at rpa site
Read moreAccumulation, loading and transportation of mining output sand from different location of mining site to and fro 12km and 10km and unloading of the sand at rpa site
Accumulation, loading and transportation of mining output sand from different location of mining site to and fro 12km and 10km and unloading of the sand at rpa site
Read moreof your Industry type