Tender Details
Particulars | Details |
---|---|
Title |
Providing, Fabrication And Fitment Of 49 Nos. Locking Arrangement Of Fuel Cap With Lock And Key For Hem Ms At Block B Project
|
Description |
Providing, Fabrication And Fitment Of 49 Nos. Locking Arrangement Of Fuel Cap With Lock And Key For Hem Ms At Block B Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_327016_1 |
Reference Number |
BLB/EXCV/ETN/24-25/505 |
Tender Fee | 0 |
EMD | 600 |
Tender Value | |
Place | OFFICE OF GM BLOCK-B AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338959 |
Start Date | January 28, 2025 15:00 |
End Date |
07/02/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Hiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Read moreProviding and fixing modular partitions sitc of electrical wiring and vrf air conditioning works for room nos. 615 and 617 of laboratory building at iiitdm kancheepuram
Providing and fixing modular partitions sitc of electrical wiring and vrf air conditioning works for room nos. 615 and 617 of laboratory building at iiitdm kancheepuram
Read moreAwarding contract for deployment of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.
Awarding contract for deployment of 28 nos. of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.
Read moreProcurement of 9 nos. of 50kl (not less than 49000 ltr capacity) water sprinklers with spare parts and service supervision under cost cap contract for a period of 8 years/ 20,000 hours whichever is earlier from the date of commissioning
Procurement of 9 nos. of 50kl (not less than 49,000 ltr capacity) water sprinklers with spare parts and service supervision under cost cap contract for a period of 8 years / 20,000 hours whichever is earlier from the date of commissioning
Read moreProviding installation testing and commissioning of pumping machinery along with electro mechanical components at wss rajal b of jal shakti phe mech division rajouri ut of jandk under jal jeevan mission jjm on turnkey basis
Providing installation testing and commissioning of pumping machinery along with electro mechanical components at wss rajal b of jal shakti phe mech division rajouri ut of jandk under jal jeevan mission jjm on turnkey basis
Read moreEoi for supply of key construction material viz., roofing sheets cgi and colour coated sheets, including gst for construction works of rural development department kashmir including freight, carriage, loading/unloading at district/ block headquarter
Eoi for supply of key construction material viz., roofing sheets cgi and colour coated sheets, including gst for construction works of rural development department kashmir including freight, carriage, loading/unloading at district/ block headquarter
Read moreDrawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ringmain works at ac and af block, aa ia under newtown division
Drawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ringmain works at ac and af block, aa ia under newtown division
Read moreRemoval and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund
Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund
Read moreAnnual cleaning of 14 nos weigh bridges platform with control room and under the weigh bridge structure at balram ocp under hingula area (for a period of 730 days).
Annual cleaning of 14 nos weigh bridges platform with control room and under the weigh bridge structure at balram ocp under hingula area (for a period of 730 days).
Read moreProviding 8 nos. of search lights on hired basis and thereafter installation and commissioning of the same on existing towers at various immersion sites during forthcoming ganpati festival for the year 2025 on per day basis
Providing 8 nos. of search lights on hired basis and thereafter installation and commissioning of the same on existing towers at various immersion sites during forthcoming ganpati festival for the year 2025 on per day basis
Read moreof your Industry type