Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Hp Bypass Spray Valve Assembly At Brbcl Nabinagar
|
Description |
Procurement Of Hp Bypass Spray Valve Assembly At Brbcl Nabinagar
|
Organisation | Bhartiya Rail Bijlee Company Limited | Public Sector Undertakings |
Tender Id | 2024_BRBCL_84212_1 |
Reference Number |
BRBCL/Nabinagar/9900274740 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bhartiya Rail Bijlee Company L H-Type Office, Than |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=87399 |
Start Date | February 16, 2024 19:30 |
End Date |
23/02/2024 ( Expired 451 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction railway rob at km. 3.485 along parali bypass on deogaon fata_parali_latur_omerga_road nh 548b in the state of maharashtra.
Construction railway rob at km. 3.485 along parali bypass on deogaon fata pathri_sonpeth_parali_ambajogai_renapur fata_latur_omerga_road nh 548b on epc mode in the state of maharashtra.
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConst. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreProcurements of spare parts for rapper coils assembly at esp installed at 2x660mw, sstpp, stage-ii, mppgcl, dongalia/etni-ii
Procurements of spare parts for rapper coils assembly at esp installed at 2x660mw, sstpp, stage-ii, mppgcl, dongalia
Read moreConstruction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Read moreEstimate for the work of attending breakdown of 12.5 hp capacity tubewell at 400 kv s/s gorakhpur under electy. 400 kv s/s division gorakhpur.
Estimate for the work of attending breakdown of 12.5 hp capacity tubewell at 400 kv s/s gorakhpur under electy. 400 kv s/s division gorakhpur.
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreSpray painting and lettering at various mcc panel of unit 5 during oh work under emiph dept btps
Spray painting and lettering at various mcc panel of unit 5 during oh work under emiph dept btps&#x0d
Read moreof your Industry type