Tender Details
Particulars | Details |
---|---|
Title |
Balance Electrical Work For Modification &Amp Power Supply Arrangements Of Stations, Lc Gates, Station Circulating Area, Approach Road, Removal &Amp Shifting Of Electrical Infringement Etc And Other Related Works In Connection With 3rd Line Work Between Rajnandgaon Nagpur Section In Nagpur Division Of Sec Railway .
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76745222 |
Reference Number |
05-tender-EL-CON-SECR-bsp |
Tender Fee | 0 |
EMD | 2.3 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76745222/viewNitPdf_4674738.pdf |
Start Date | August 20, 2024 22:24 |
End Date |
17/09/2024 ( Expired 264 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (25 nos lc gates) in lucknow division /ner under jurisdiction of tier-2/gorakhpur(lucknow territory)
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (25 nos lc gates) in lucknow division /ner under jurisdiction of tier-2/gorakhpur(lucknow territory)
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work ( 11 nos lc gates ) in jhansi division/ncr under jurisdiction of tier-2/ jhansi (delhi territory).
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work ( 11 nos lc gates ) in jhansi division/ncr under jurisdiction of tier-2/ jhansi (delhi territory).
Read moreShifting of electrical infrastructure with laying of 11 kv ug line to facilitate the work of construction of limited height subway at several lc gates
Shifting of electrical infrastructure with laying of 11 kv ug line to facilitate the work of construction of limited height subway at several lc gates in between khetia and balgona station at burdwan katwa rail line under purba bardhaman district
Read moreConstruction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Read moreIn gorakhpur, the work of shifting the underground drinking water pipeline coming under protection for the construction of 02 lane overpass at crossing number 162a between domingarh and gorakhpur junction rallway stations of lucknow gorakhpur railway
In gorakhpur, the work of shifting the underground drinking water pipeline coming under protection for the construction of 02 lane overpass at crossing number 162a between domingarh and gorakhpur junction rallway stations of lucknow gorakhpur railway
Read moreConstruction of balance work of rob at km 30.00 of nh162e pali nadol section crossing falna marwar railway section at lc no c67 near somesar in the state of rajasthan on epc mode
Construction of balance work of rob at km 30.00 of nh162e pali nadol section crossing falna marwar railway section at lc no c67 near somesar in the state of rajasthan on epc mode
Read moreGeneral-maintenance and replacement of fountain pump sets and nozzles in front of niyamasabha building thiruvananthapuram.-in connection with klibf 3rd edition 2025- general electrical work
General-maintenance and replacement of fountain pump sets and nozzles in front of niyamasabha building thiruvananthapuram.-in&#x0d connection with klibf 3rd edition 2025- general electrical work
Read moreof your Industry type