Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supplying, Stacking And Dumping Of Flood Fighting Material At Thokar No 13 During Flood Season 2025.
|
| Description |
Supplying, Stacking And Dumping Of Flood Fighting Material At Thokar No 13 During Flood Season 2025.
|
| Organisation | Irrigation and Flood Control | State Govt. and UT |
| Tender Id | 2025_IFC_276028_1 |
|
Reference Number |
33/EE/CD-III/25-26 |
| Tender Fee | 0 |
| EMD | 34406 |
| Tender Value | - |
| Place | East Delhi |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=363835 |
| Start Date | July 26, 2025 18:10 |
| End Date |
Expired
02/08/2025
Expired 435 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Filling of cc patches and dust filling at various places of ramnagar ,markendeyanagar and shiva nagar locality during the bathukamma festival 2026 in division no 13 of municipal corporation karimnagar est. cost of rs. 3.40 lakhs under mgf
Filling of cc patches and dust filling at various places of ramnagar ,markendeyanagar and shiva nagar locality during the bathukamma festival 2026 in division no 13 of municipal corporation karimnagar est. cost of rs. 3.40 lakhs under mgf
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreProviding of temporary lighting (150 nos. of 120w led flood lights) for 2 days (12-10-2026 to 13-10-2026) at dargah hzt bahadur shah baba (ra), situated opp madarsa, sultan bagh in shah ali banda division (104) in falaknuma circle-22 of rajendra nagar zone, ghmc in view of urs-e-shareef.
Providing of temporary lighting (150 nos. of 120w led flood lights) for 2 days (12-10-2026 to 13-10-2026) at dargah hzt bahadur shah baba (ra), situated opp madarsa, sultan bagh in shah ali banda division (104) in falaknuma circle-22 of rajendra nagar zone, ghmc in view of urs-e-shareef.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreSupplying, stacking and dumping of flood fighting material at thokar no-17 during flood season 2025.
Supplying, stacking and dumping of flood fighting material at thokar no-17 during flood season 2025.
Read moreSupplying, stacking and dumping of flood fighting material at thokar near geeta colony samshan ghat.
Supplying, stacking and dumping of flood fighting material at thokar near geeta colony samshan ghat.
Read moreSupplying, stacking and dumping of flood fighting material at end of channel erosion near upstream side of thokar no. 13.
Supplying, stacking and dumping of flood fighting material at end of channel erosion near upstream side of thokar no. 13.
Read moreEngagement of outsourcing agency for supplying manpower(beldar/canal guard) during flood season and running of canal.
Engagement of outsourcing agency for supplying manpower(beldar/canal guard) during flood season and running of canal.
Read moreSupply of flood fighting materials at l.f.bund sonia vihar pump house for flood season 2026.
Supply of flood fighting materials at l.f.bund sonia vihar pump house for flood season 2026.
Read moreA/r and m/o drains - sw - supplying, stacking and placing of earth filled e.c. bags for flood season 2024 in distt. west.
A/r and m/o drains - sw - supplying, stacking and placing of earth filled e.c. bags for flood season 2024 in distt. west.
Read moreof your Industry type