Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
In Situ Machining And Drilling Of Azimuth Thruster Foundations In Csov By.151
|
| Description |
In Situ Machining And Drilling Of Azimuth Thruster Foundations In Csov By.151
|
| Organisation | Cochin Shipyard Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_CSL_787695_1 |
|
Reference Number |
SB-OSD/CSOV/921/2025 Dtd 04-02-2025 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Cochin Shipyard Ltd, Cochin |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1092062 |
| Start Date | February 17, 2025 15:30 |
| End Date |
Expired
18/02/2025
Expired 603 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of oxygen and acetylene cylinders for csov by 151-152,procurement of oxygen and acetylene cylinders for csov by 151-152
Procurement of oxygen and acetylene cylinders for csov by 151-152,procurement of oxygen and acetylene cylinders for csov by 151-152
Read moreCustom bid for services - 3 months contract for in-situ and non-in-situ machining, fabrication and supply of irep ct sluice gate valve operating mechanism and spare kit of irep ct discharge valves for bpcl kr shutdown jobs
Custom bid for services - 3 months contract for in-situ and non-in-situ machining, fabrication and supply of irep ct sluice gate valve operating mechanism and spare kit of irep ct discharge valves for bpcl kr shutdown jobs
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreIn-situ machining and drilling of pedestal foundation for 3d motion crane in csov by.151
In-situ machining and drilling of pedestal foundation for 3d motion crane in csov by.151
Read moreAzimuth thruster with accessories_3041_610701000001_1000053582,on board spares for azimuth thruster
Read more
Auxiliary engine circuit breakers,bow thruster circuit breakers,azimuth thruster circuit breakers,t
Read more
of your Industry type