Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earth Work In Excavation,Pcc In Floor Foundation,Brick Work In Super Structure,Plaster Work On Inne
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4685787 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 26, 2024 17:19 |
| End Date |
Expired
07/03/2024
Expired 952 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | C B ENTERPRISES | - | 02-03-2024 12:10:51 | MII MSE | Qualified |
| 2 | M/S UMA ENTERPRISES | - | 04-03-2024 14:52:38 | MII MSE | Qualified |
| 3 | M/S UTSAV ENTERPRISES | - | 04-03-2024 14:19:55 | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | M/S UTSAV ENTERPRISES(MSE,MII)( MSE Social Category:OBC ) | Item Categories : Earth Work in excavation,PCC In floor Foundation,Brick work in super structure,Plaster work on inne | 125000.00 | L1 |
| 2 | M/S UMA ENTERPRISES (MSE,MII)( MSE Social Category:OBC ) | Item Categories : Earth Work in excavation,PCC In floor Foundation,Brick work in super structure,Plaster work on inne | 149122.00 | L2 |
| 3 | C B ENTERPRISES (MSE,MII)( MSE Social Category:General ) | Item Categories : Earth Work in excavation,PCC In floor Foundation,Brick work in super structure,Plaster work on inne | 179300.00 | L3 |
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Read moreEarth excavation,cement,brick work,brick work with burnt clay,wood work for doors and frame,glazed wall tiles,glazed floor tiles,pvc door,wash basin,waste pipe,water closquatting pan,cpvc pipe,rigid pvc pipe,upvc moulded pipe,upvc moulded accessories,construction of septic tank
Earth excavation,cement,brick work,brick work with burnt clay,wood work for doors and frame,glazed wall tiles,glazed floor tiles,pvc door,wash basin,waste pipe,water closquatting pan,cpvc pipe,rigid pvc pipe,upvc moulded pipe,upvc moulded accessories,construction of septic tank
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreLayout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Read moreEarth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Earth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreDismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Dismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreFacility management services - lumpsum based - government office earth work with sand filling & brick flate solling 76ft 6inch x 1ft 3inch consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office brick work with plaster 76ft 6inch x 10inch x 1ft 3inch consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office pcc work 76ft 6inch x 10inch x 3inch & 76ft 6inch x 1ft 3inch x 3inch consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office 08no of holo pipe 3inch lenth 5ft with ornamental work & installation consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office granite work on wall top 76ft 6inch x 1ft consumables to be provided by service provider (inclusive in contract cos
Facility management services - lumpsum based - government office earth work with sand filling & brick flate solling 76ft 6inch x 1ft 3inch consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office brick work with plaster 76ft 6inch x 10inch x 1ft 3inch consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office pcc work 76ft 6inch x 10inch x 3inch & 76ft 6inch x 1ft 3inch x 3inch consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office 08no of holo pipe 3inch lenth 5ft with ornamental work & installation consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - government office granite work on wall top 76ft 6inch x 1ft consumables to be provided by service provider (inclusive in contract cos
Read moreof your Industry type