Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Road Maintenance And Construction 🛠️ The Chief Engineer, Pwd (R And B), Representing The State Government And Union Territories, Invites Bids For The Maintenance And Construction Of A Road Stretch From Barpathari To Tulamura Up To Golachipa, Covering A Distance Of 5 Km (Group No. I) For The Year 2024 25. 📅 Bid Submission Deadline: July 15, 2024, 3:00 Pm The Scope Of Work Includes The Repair Of Pot Holes, Re Carpeting, Seal Coat, And Surface Drain Maintenance. Interested Contractors Must Submit Their Bids Along With A Tender Fee Of Inr 10,000 And An Earnest Money Deposit (Emd) Of Inr 48,488. Keywords: Road Maintenance, Construction, Pwd (R And B), State Govt. And Ut, Infrastructure Project, Bid Submission, Tender Fee, Emd| Particulars | Details |
|---|---|
| Title |
Mtc. Of Road From Barpathari To Tulamura Upto Golachipa During The Year 2024 25 From Ch.0.00 Km To 5.00 Km (Group No. I).
|
| Description |
Pot Holes Repair, Re Carpeting, Seal Coat And Surface Drain Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_49890_1 |
|
Reference Number |
08/NIT/EE/BD/PWD/BLN/2024-25. |
| Tender Fee | 1000 |
| EMD | 48488 |
| Tender Value | - |
| Place | Rajnagar R.D. Block area |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=50737 |
| Start Date | June 24, 2024 20:30 |
| End Date |
Expired
15/07/2024
Expired 821 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Periodical repair / maintenance of road from barpathari-tulamura road to taichama kalibari (l-3.70 km) under rajnagar sub-division, pwd(randb) during the year 2025-26 (2nd call).
Patch metalling, pot holes repairing, re-carpeting, tack coat, seal coat, construction of drain etc.
Read moreDevelopment of road from belonia-ekinpur road at prakash nagar to muslimpara via rajnagar hospital under rajnagar sub-division, pwd(randb) during the year 2026-27 (ch. from 0.00 km to ch. 1.60 km).
Patch metalling, grouting, re-carpeting, seal coating etc.
Read moreDevelopment of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Read moreDevelopment of road from belonia-gouranga bazar road at ekinpur bazar to noabad under rajnagar sub-division, pwd(randb) during the year 2026-27 (ch. from 0.00 km to 1.10 km).
Patch metalling, grouting, re-carpeting, seal coat, road side pucca drain and other allied works
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling recarpeting, seal coat, surface drain, pucca drain, toe wall, etc. gr ii from ch. 2.50 km t
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling recarpeting, seal coat, surface drain, pucca drain, toe wall, etc. gr ii from ch. 2.50 km t
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Read moreUrgent mtc. of roads from barpathari to tulamura upto golachipa road (l-9.20 km) of rajnagar pwd sub-division during the year 2024-25 from ch. 0.00 km to 3.00 km.(group no.-i).
Patch metalling, pot holes repair, re-carpeting and surface drain
Read moreFdr/mtc. of road from barpathari-tulamura upto golachipa road (l-9.20 km) of rajnagar pwd sub-division during the year 2024-25
Brick soling, patch metalling, pot holes repair, patch carpeting, surface drain and landslide clearance etc
Read moreUrgent mtc. of roads from barpathari to tulamura upto golachipa road (l-9.20 km) of rajnagar pwd sub-division during the year 2024-25 from ch. 3.50 km to 6.50 km (group no.-ii).
Patch metalling, pot holes repair, re-carpeting and surface drain
Read moreUrgent mtc. of road from barpathari to tulamura upto golachipa road (l-9.25 km) of rajnagar pwd sub-division during the year 2025-26 from ch.6.25 km to 9.25 km.
Patch metalling, pot holes repair, re-carpeting and surface drain
Read moreof your Industry type