Tender Details

Particulars Details
Title
Replacement Of Damaged Conveyor Brackets, Top Roller, Bottom Roller And Foot Stool Of 1200mm. Size Belt Conveyor At 19 L Belt Of Rviia Seam Of Shyamsundarpur Colliery.
Description
Replacement Of Damaged Conveyor Brackets, Top Roller, Bottom Roller And Foot Stool Of 1200mm. Size Belt Conveyor At 19 L Belt Of Rviia Seam Of Shyamsundarpur Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_309415_1
Reference
Number
ECL/GM/BA/E TENDER/24-25/EnM/33 Dt 30.05.2024
Tender Fee 0
EMD 2600
Tender Value
Place shyamsundarpur colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320606
Start Date May 30, 2024 23:30
End Date

10/06/2024 ( Expired 346 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Heightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area

Heightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area&#x0d

Read more
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.

Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.

Read more
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.

Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.

Read more
Work contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat

Work contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat

Read more
Replacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area

Replacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area

Read more
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.

Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.

Read more
Repairing of pressure drum (size 630 mm dia x 1400 mm long) of steel chord conveyor belt of cm project at shyamsundarpur colliery under bankola area

Repairing of pressure drum (size 630 mm dia x 1400 mm long) of steel chord conveyor belt of cm project at shyamsundarpur colliery under bankola area

Read more
Replacement of damaged sheet of c4 belt line and strengthening of gantry post at rls of bharatpur ocp.

Replacement of damaged sheet of c4 belt line and strengthening of gantry post at rls of bharatpur ocp.

Read more
Collection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.

Collection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.

Read more
Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise