Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Damaged Conveyor Brackets, Top Roller, Bottom Roller And Foot Stool Of 1200mm. Size Belt Conveyor At 19 L Belt Of Rviia Seam Of Shyamsundarpur Colliery.
|
Description |
Replacement Of Damaged Conveyor Brackets, Top Roller, Bottom Roller And Foot Stool Of 1200mm. Size Belt Conveyor At 19 L Belt Of Rviia Seam Of Shyamsundarpur Colliery.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_309415_1 |
Reference Number |
ECL/GM/BA/E TENDER/24-25/EnM/33 Dt 30.05.2024 |
Tender Fee | 0 |
EMD | 2600 |
Tender Value | |
Place | shyamsundarpur colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320606 |
Start Date | May 30, 2024 23:30 |
End Date |
10/06/2024 ( Expired 346 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Heightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area
Heightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area
Read moreInstallation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Read moreReplacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreWork contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat
Work contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat
Read moreReplacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Replacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Read moreTransportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Read moreRepairing of pressure drum (size 630 mm dia x 1400 mm long) of steel chord conveyor belt of cm project at shyamsundarpur colliery under bankola area
Repairing of pressure drum (size 630 mm dia x 1400 mm long) of steel chord conveyor belt of cm project at shyamsundarpur colliery under bankola area
Read moreReplacement of damaged sheet of c4 belt line and strengthening of gantry post at rls of bharatpur ocp.
Replacement of damaged sheet of c4 belt line and strengthening of gantry post at rls of bharatpur ocp.
Read moreCollection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.
Collection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.
Read moreConstruction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.
Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.
Read moreof your Industry type