Tender Details

About Tender

🚂 Procurement Alert: Biaxial Geogrid For Tftr Project 🛣️🛠️ The Ministry Of Railways, Under The Central Government, Is Calling For Bids From Suppliers For The Supply Of Biaxial Geogrid For The Ratlam Dr. Amdedkarnagar Section Of The Tftr Project. 🌏 📅 Bid Submission Deadline: May 28, 2024, 3:00 Pm A Tender Security Amount Of Inr 276300 Is Required With The Bid. No Tender Fee Is Payable. Interested Suppliers Must Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Tender Document For The Project. Keywords: Biaxial Geogrid, Tftr Project, Ministry Of Railways, Infrastructure, Central Government Tender, Procurement, Construction Materials
Particulars Details
Title
Ratlam Dr. Amdedkarnagar Tftr (Biaxial Geogrid) 10.853 Tkm
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73729321
Reference
Number
RTM-2023-24-166
Tender Fee 0
EMD 2.76 Lakh
Tender Value -
Place Mumbai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/052024/73729321/viewNitPdf_4488026.pdf

Start Date May 02, 2024 16:59
End Date
Expired 28/05/2024

Expired 874 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Read more
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.

A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.

Read more
Mp31ptn058/ratlam

Repair / maintenance of the rural roads/cds for five years, constructed under pradhan mantri gram sadak yojna and other scheme- post 10 year

Read more
Mp31mtn111/ratlam

Repair / maintenance of the rural roads/cds for five years, constructed under pradhan mantri gram sadak yojna and other scheme- post 5 year

Read more
General college boys hostel ratlam, district ratlam building construction

General college boys hostel ratlam, district ratlam building construction

Read more
Howrah division-tftr-3.008 tkm, bdc-kwae: up 12.625-13.100=0.475 km, 76.285-76.466=0.181 km, 11.930-12.820=0.890 km, 76.286-76.450=0.164 km, 79.597-80.310=0.713 km, 80.440-81.025=0.585 km under jurisdiction of sr.den/3/hwh

Howrah division-tftr-3.008 tkm, bdc-kwae: up 12.625-13.100=0.475 km, 76.285-76.466=0.181 km, 11.930-12.820=0.890 km, 76.286-76.450=0.164 km, 79.597-80.310=0.713 km, 80.440-81.025=0.585 km under jurisdiction of sr.den/3/hwh

Read more
S&t works in connection with slgr-mrht & fkg-mxn (sl) - tsr (p) -28.800 tkm & 17.200 tkm respectively

S&t works in connection with slgr-mrht & fkg-mxn (sl) - tsr (p) -28.800 tkm & 17.200 tkm respectively

Read more
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway

Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway

Read more
Ratlam division - ratlam division- renewal of electrical earthing and electrical wiring (balance work).

Ratlam division - ratlam division- renewal of electrical earthing and electrical wiring (balance work).

Read more
Hatwar - kumedpur (up & dn) - tsr(p) - 55.412 tkm.

Hatwar - kumedpur (up & dn) - tsr(p) - 55.412 tkm.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise