Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A)repairs, Provision Of Ohe Protective Screen &Amp Protective Painting To Trombay Line Rob At Km. 19/18 A 19 B Between Cla Tmby Line.(Deposit Work Of Mcgm)
B) Replacement Of Damaged /Wornout Inspection Board To Fob S /Rob S / Pipeline Bridge &Amp Provision By Bridge Board To Fob S &Amp Pipeline Bridge In The By Vk Section Over Main Line &Amp Kce Mnkd Section Over Hb Line Under Aden(wks)by
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83311677 |
|
Reference Number |
CR-DRMWBB-2025-23-04 |
| Tender Fee | 0 |
| EMD | 1.27 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83311677/viewNitPdf_5056341.pdf |
| Start Date | August 07, 2025 21:58 |
| End Date |
Expired
01/09/2025
Expired 411 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of foot over bridge (fob) at digha railway station.
Construction of foot over bridge (fob) at digha railway station.
Read moreProvision of 3.0 meter wide foot over bridge (fob) at sariabanjara (sbj) railway station.
Provision of 3.0 meter wide foot over bridge (fob) at sariabanjara (sbj) railway station.
Read moreConstruction of foot over bridge on replacement of existing destressed bridge on masjid station at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)
Construction of foot over bridge on replacement of existing destressed bridge on masjid station at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)
Read moreConstruction of foot over bridge on replacement of existing destressed bridge on masjid stn. at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)
Construction of foot over bridge on replacement of existing destressed bridge on masjid stn. at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)
Read moreOhe work in connection with provision of new foot over bridge (fob) at adityapur station in ckp division.
Ohe work in connection with provision of new foot over bridge (fob) at adityapur station in ckp division.
Read moreAppointment of contractor for construction of foot over bridge (fob) across western express highway at gundavali metro station (metro line 7).
Appointment of contractor for construction of foot over bridge (fob) across western express highway at gundavali metro station (metro line 7).
Read moreDesign, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh
Design, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreAppointment of consultant for techno-economic feasibility study, detailed engineering, engineering design, cost estimates, tender documents and technical specifications for construction of a 4-lane road over bridge (rob) for inter terminal rail handl
Appointment of consultant for techno-economic feasibility study, detailed engineering, engineering design, cost estimates, tender documents and technical specifications for construction of a 4-lane road over bridge (rob) for inter terminal rail handl
Read moreof your Industry type