Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚇 Invitation For Bids: Nagpur Metro Rail Project Phase 2 🏗️🔧 Maharashtra Metro Rail Corporation Limited (Maha Metro), Under The Aegis Of The Asian Development Bank (Adb) And As Part Of The State Government And Union Territories, Is Seeking Bids From Experienced Contractors For The Comprehensive Execution Of The Design, Supply, Installation, Testing, And Commissioning Of 25 Kv Flexible Overhead Equipment (Ohe) And Sectioning Posts For The Nagpur Metro Rail Project Phase 2. 📅 Bid Submission Deadline: May 14, 2024, 4:00 Pm Tender Fee: Inr 88500 Emd: Inr 10500000 Interested Bidders Must Possess The Requisite Expertise And A Proven Track Record In Similar High Voltage Infrastructure Projects. Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Metro Rail Project, Nagpur, Maharashtra Metro Rail Corporation Limited, Adb Tenders, Overhead Equipment, Sectioning Posts, Infrastructure Development, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Design, Supply, Installation, Testing And Commissioning Of 25 Kv Flexible Ohe And Sectioning Posts For Nagpur Metro Rail Project Phase 2
|
| Description |
Design, Supply, Installation, Testing And Commissioning Of 25 Kv Flexible Ohe And Sectioning Posts For Nagpur Metro Rail Project Phase 2
|
| Organisation | Maharashtra Metro Rail Corporation Limited - ADB Tenders | State Govt. and UT |
| Tender Id | 2024_MMRCN_982392_1 |
|
Reference Number |
N2-030/TR-02/2023 |
| Tender Fee | 88500 |
| EMD | 1.05 Crore |
| Tender Value | - |
| Place | Nagpur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1716342 |
| Start Date | January 11, 2024 20:30 |
| End Date |
Expired
26/06/2024
Expired 841 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Activity based maintenance contract of ohe and psi for 90 tkm main line & depot ohe, 37 station ass & 2 depot ass, 2 rss, 2 tss and 23 switching stations of nagpur metro rail project of maha-metro for 1 year extendable up to 1 year.
Activity based maintenance contract of ohe and psi for 90 tkm main line & depot ohe, 37 station ass & 2 depot ass, 2 rss, 2 tss and 23 switching stations of nagpur metro rail project of maha-metro for 1 year extendable up to 1 year.
Read moreDdc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Ddc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreDevelopment/improvement of non-motorised transport (nmt) initiatives of kochi metro rail ltd phase 2 jln stadium to kunnumpuram junction
Development/improvement of non-motorised transport (nmt) initiatives of kochi metro rail ltd phase 2 jln stadium to kunnumpuram junction
Read moreFacility management services for 18 stations of line-1 of nagpur metro rail project for providing the following (a) mechanized housekeeping, cleaning services,(b) ticketing (tom/efo) services, (c) security services for the period of 01 year.
Facility management services for 18 stations of line-1 of nagpur metro rail project for providing the following (a) mechanized housekeeping, cleaning services,(b) ticketing (tom/efo) services, (c) security services for the period of 01 year.
Read moreFacility management services for 19 stations of line-2 of nagpur metro rail project for providing the following, (a) mechanized housekeeping, cleaning services, (b) ticketing(tom/efo)services, (c) security services for the period of 01 (one) year.
Facility management services for 19 stations of line-2 of nagpur metro rail project for providing the following, (a) mechanized housekeeping, cleaning services, (b) ticketing(tom/efo)services, (c) security services for the period of 01 (one) year.
Read moreDesign, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.
Design, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.
Read moreShortlisting of general consultants for corridor-1 and 2 of phase-3 of bangalore metro rail project.
Shortlisting of general consultants for corridor-1 and 2 of phase-3 of bangalore metro rail project.
Read moreEngagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Read moreContract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.
Contract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.
Read moreof your Industry type