Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying Of Strom Water Line At Nayay Nagar C M Second In Ward No. 33 Under Zone No. 05 Third Call
|
| Description |
Laying Of Strom Water Line At Nayay Nagar C M Second In Ward No. 33 Under Zone No. 05 Third Call
|
| Organisation | Directorate Urban Administration and Development | State Govt. and UT |
| Tender Id | 2024_UAD_359968_1 |
|
Reference Number |
47/SE/BILLS/24-25/G-07 |
| Tender Fee | 5316 |
| EMD | 20100 |
| Tender Value | - |
| Place | INDORE |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=423261 |
| Start Date | July 29, 2024 23:30 |
| End Date |
Expired
09/08/2024
Expired 798 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreRepairing the roof top of the second floor and third floor of raurkela municipal corporation office building to prevent from leakage , ward no. 28, under rmc, rourkela
Civil work
Read morePreventive maintenance of 05 mva pt installed at 33/11 kv ss-sipah ibrahimabad under edd ghosi
Preventive maintenance of 05 mva pt installed at 33/11 kv ss-sipah ibrahimabad under edd ghosi
Read moreSecond tubewell pump
25 h p tuwebell pump installation and pump room construction work at nagar panchyat sakhanu budaun
Read moreBased strom sewer network plan for rudraprayag dist. rudraprayag
Based strom sewer network plan for rudraprayag dist. rudraprayag
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreIn ward-96, nehru nagar-third e-block, construction of drain and interlocking tiles in the service line from third-e-6 to third-e-7/2 and from third-e-5 to third-e-1 and work of interlocking tiles on the side track in front of primary school nasirpur
In ward-96, nehru nagar-third e-block, construction of drain and interlocking tiles in the service line from third-e-6 to third-e-7/2 and from third-e-5 to third-e-1 and work of interlocking tiles on the side track in front of primary school nasirpur
Read moreof your Industry type