Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Janai Baksa Krishnarampore Road From 0.00 Kmp To 3.78 Km, Strengthening Works Under Hooghly Highway Division No. Ii In The District Of Hooghly. (Balance Work).
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5.89 Lakh |
Tender Value | |
Place | Hooghly |
Link |
AAAAAAAAAA Login to view |
Start Date | December 12, 2024 17:30 |
End Date |
24/12/2024 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-sectioning from km 0.00 to km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and widening and strengthening from km 8.20 to km 15.00 of nh-327 -old nh-31c- in the district of darjeeling, job no.554.
Re-sectioning from km 0.00 to km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and widening and strengthening from km 8.20 to km 15.00 of nh-327 -old nh-31c- in the district of darjeeling, job no.554.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Read moreProviding speed calming measures in kallar elephant corridor from km 56/000 to km 58/400 of nh-181 ( coimbatore -ooty -gundalpet road ) under ap-2024-25 in the state of tamil nadu
Providing speed calming measures in kallar elephant corridor from km 56/000 to km 58/400 of nh-181 ( coimbatore -ooty -gundalpet road ) under ap-2024-25 in the state of tamil nadu
Read morePlc of wmm 100 mm wmm 150 mm dbm 60 mm and bc 40 mm thick inclu cleaning of road surface and applying prime and tack coat alongwith road marking as per morth spec bet km 80 to km 86 on sktt rd under 94 rcc 38 brtf of project deepak in hp
Plc of wmm 100 mm wmm 150 mm dbm 60 mm and bc 40 mm thick inclu cleaning of road surface and applying prime and tack coat alongwith road marking as per morth spec bet km 80 to km 86 on sktt rd under 94 rcc 38 brtf of project deepak in hp
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreDevelop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreEngaging technical consultant for preparation of feasibility study (fs) and detailed project report (dpr) for construction of new road manul-menshithang to nhsl specifications between km 0.00 to km 52.00 through green field alignment in the aor of 10
Engaging technical consultant for preparation of feasibility study (fs) and detailed project report (dpr) for construction of new road manul-menshithang to nhsl specifications between km 0.00 to km 52.00 through green field alignment in the aor of 10
Read moreDevelopment of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Development of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Read moreof your Industry type