Tender Details
Particulars | Details |
---|---|
Title |
Widening And Deepening Of Gardland Drain Around Dump No.6 To Pr Inundation Toward Brahmani Village.
|
Description |
Widening And Deepening Of Gardland Drain Around Dump No.6 To Pr Inundation Toward Brahmani Village.
|
Organisation | Western Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 11400 |
Tender Value | |
Place | Brahmani Village |
Link |
AAAAAAAAAA Login to view |
Start Date | May 12, 2025 17:30 |
End Date |
22/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreRfp for procurement of qty 4 modules for testing of r73e mssls on oka e1 test bench qty 8 modules for testing of x 31p mssls on okae1 test bench and qty 6 modules for testing of rvvae mssls on okae1 test bench to facilitate inter operability
Rfp for procurement of qty 4 modules for testing of r73e mssls on oka e1 test bench qty 8 modules for testing of x 31p mssls on okae1 test bench and qty 6 modules for testing of rvvae mssls on okae1 test bench to facilitate inter operability
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreDemolition and reconstruction of bldg no p 9 to p 14 single or living accn at bikaner military station
Demolition and reconstruction of bldg no p 9 to p 14 single or living accn at bikaner military station
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction of cc road and rcc drain from bus stand to ripta pul
Construction of cc road and rcc drain from bus stand to ripta pul
Read moreof your Industry type