Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Immediate Restoration Of Cc Road By High Performance Pre Mix Cement Mortar/Geopolymer Mortar On Road Under Unit I Jodhpur, Unit Ii Jodhpur, Unit Pali And Unit Sirohi
|
Description |
Immediate Restoration Of Cc Road By High Performance Pre Mix Cement Mortar/Geopolymer Mortar On Road Under Unit I Jodhpur, Unit Ii Jodhpur, Unit Pali&Amp#X0d
And Unit Sirohi
|
Organisation | RSRDCC-GM | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 70000 |
Tender Value | |
Place | Jodhpru |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 22:30 |
End Date |
07/07/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
8707 special repair to roof leakage of block 1 cl 2 3 and block 2 cl 5 6 of kv school provn of chain link fencing on boundary wall at vikram batra enclave provn of stone grill spl rep to bldg no t34 servant qtr under br i and brii em ii ges pune
8707 special repair to roof leakage of block 1 cl 2 3 and block 2 cl 5 6 of kv school provn of chain link fencing on boundary wall at vikram batra enclave provn of stone grill spl rep to bldg no t34 servant qtr under br i and brii em ii ges pune
Read moreCement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07
Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07
Read moreConstruction of internal road to stok phase ii by way of retaining wall and other allied work under district plan
Construction of internal road to stok phase ii by way of retaining wall and other allied work under district plan
Read moreConstruction of cc or rcc foundation,development of approach road of approx. length 1000.00 mtr, construction of plinth to suit vfd e 2000 rig at any drilling location under moran and lakwagaon demow area or any other area,including supply all material except cement and bitumen drum sheet.
Construction of cc or rcc foundation,development of approach road of approx. length 1000.00 mtr, construction of plinth to suit vfd e 2000 rig at any drilling location under moran and lakwagaon demow area or any other area,including supply all material except cement and bitumen drum sheet.
Read moreConstruction of cc or rcc foundation,development of approach road of approx. length 500.00 mtr, construction of plinth to suit vfd e 2000 rig at any drilling location under moran and lakwagaon demow area or any other area,including supply all material except cement and bitumen drum sheet.
Construction of cc or rcc foundation,development of approach road of approx. length 500.00 mtr, construction of plinth to suit vfd e 2000 rig at any drilling location under moran and lakwagaon demow area or any other area,including supply all material except cement and bitumen drum sheet.
Read moreConstruction of 500 mtr long approach road including cross drainage works, well plinth, road over plinth, cc or rcc foundation to suit e 1400 ac scr rig outfit at lakwagaon, demow area or any other location including supply of all materials by the contractor except cement and bitumen drum sheet.
Construction of 500 mtr long approach road including cross drainage works, well plinth, road over plinth, cc or rcc foundation to suit e 1400 ac scr rig outfit at lakwagaon, demow area or any other location including supply of all materials by the contractor except cement and bitumen drum sheet.
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreInstallation of street lights on the stretch of road from the newly constructed moukhali kheyaghat bridge to mahishara bazar under tambuldaha-i gp of canning-ii block, south 24 parganas
Installation of street lights on the stretch of road from the newly constructed moukhali kheyaghat bridge to mahishara bazar under tambuldaha-i gp of canning-ii block, south 24 parganas
Read moreRaising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Read moreSupply of 300nb fittings with flanges on both ends for high pressure water pump discharge line of stage i and ii
Supply of 300nb fittings with flanges on both ends for high pressure water pump discharge line of stage i and ii
Read moreof your Industry type