Tender Details
Particulars | Details |
---|---|
Title |
Repair Of Grid Connected Solar Power Plants(10 Kwp 3 Nos) At New Tinsukia Railway Station And Drm Office Compound Con Of Existing 10 Kw Rooftop Off Grid Solar Power System To On Grid Solar Power System At Furkating Station, Tinsukia Station,Ledo Station &Amp Dbrg Station Grp Thana.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76576564 |
Reference Number |
LV-T-14-TSK-876 |
Tender Fee | 0 |
EMD | 34900 |
Tender Value | |
Place | Guwahati |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76576564/viewNitPdf_4663995.pdf |
Start Date | August 02, 2024 04:03 |
End Date |
23/08/2024 ( Expired 263 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rate contract for selection of agencies for cmco of installed grid connected rooftop solar power plants for 05 (five) years including replacement of pcus and batteries and other components as and where required basis at various districts in the state
Rate contract for selection of agencies for cmco of installed grid connected rooftop solar power plants for 05 (five) years including replacement of pcus and batteries and other components as and where required basis at various districts in the state
Read moreSupply, installation, testing and commissioning of 50 kw grid connected solar power generating system with 5 years of cmc at wada nagarpanchayat ( new ghankachara project)
Supply, installation, testing and commissioning of 50 kw grid connected solar power generating system with 5 years of cmc at wada nagarpanchayat ( new ghankachara project)
Read moreCumulative 245 kw capacities of grid connected solar pv power plant under rooftop net metering system with five years cmc at various government offices, educational institutes, hostels in washim district
Cumulative 245 kw capacities of grid connected solar pv power plant under rooftop net metering system with five years cmc at various government offices, educational institutes, hostels in washim district
Read more150 kw grid connected solar pv power plant under rooftop net metering system at new administrative building, collector office, akola, dist. akola
150 kw grid connected solar pv power plant under rooftop net metering system at new administrative building, collector office, akola, dist. akola
Read moreSupply, installation, testing and commissioning of total 228 kw grid connected solar pv power plant with roof-top net metering, 03 nos. of 10 hp dc and 04 nos. of 7.5 hp dc solar water pumping system at 11 various places of gadchiroli district
Supply, installation, testing and commissioning of total 228 kw grid connected solar pv power plant with roof-top net metering, 03 nos. of 10 hp dc and 04 nos. of 7.5 hp dc solar water pumping system at 11 various places of gadchiroli district
Read moreCumulative 105 kwp capacities of grid connected solar pv power plant under rooftop net metering system with five years cmc at various government hospitals in buldhana district
Cumulative 105 kwp capacities of grid connected solar pv power plant under rooftop net metering system with five years cmc at various government hospitals in buldhana district
Read moreProviding, installation, testing and commissioning of 25 kwp off grid solar power plants at various bops of 74 bn bsf shq bhuj, under ftr hq gujarat.(11 nos bop) (including construction of rcc framed structure for battery room)
Providing, installation, testing and commissioning of 25 kwp off grid solar power plants at various bops of 74 bn bsf shq bhuj, under ftr hq gujarat.(11 nos bop) (including construction of rcc framed structure for battery room)
Read moreProviding, installation, testing and commissioning of 25 kwp off grid solar power plants at bops of 153 bn bsf shq bsf bhuj, under ftr hq gujarat.(18 nos. bops) (including construction of rcc framed structure for battery room)
Providing, installation, testing and commissioning of 25 kwp off grid solar power plants at bops of 153 bn bsf shq bsf bhuj, under ftr hq gujarat.(18 nos. bops) (including construction of rcc framed structure for battery room)
Read moreProviding, installation, testing and commissioning of 25 kwp off grid solar power plants at bops of 153 bn bsf shq bsf bhuj, under ftr hq gujarat.(18 nos. bops) (including construction of rcc framed structure for battery room)
Providing, installation, testing and commissioning of 25 kwp off grid solar power plants at bops of 153 bn bsf shq bsf bhuj, under ftr hq gujarat.(18 nos. bops) (including construction of rcc framed structure for battery room)
Read moreCon of existing 5kwp off grid power plant to grid connected spv power plant with battery backup at block panchayat office, varkala, thiruvananthapuram
Con of existing 5kwp off grid power plant to grid connected spv power plant with battery backup at block panchayat office, varkala, thiruvananthapuram
Read moreof your Industry type