Tender Details

Particulars Details
Title
Ttps Mech Ii Bm Unit I Painting Of The Safety Valve Exhaust Pipes Its Silencers And Cst Tank During The Overhaul 2024 2025
Description
Ttps Mech Ii Bm Unit I Painting Of The Safety Valve Exhaust Pipes Its Silencers And Cst Tank During The Overhaul 2024 2025
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_461885_1
Reference
Number
CE/TTPS/SE/M-II/No.355/2024-25
Tender Fee 0
EMD 3400
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548888
Start Date July 10, 2024 23:30
End Date

26/07/2024 ( Expired 319 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Annual mtc. of govt. office building of teliamura sub-division no. i, teliamura sub-division no. ii, kalyanpur sub-divisoin and mungiakami sub division, pwd(randb) and govt. residencial quarter within teliamura pwd complex during the year 2025-26.

Annual mtc. of govt. office building of teliamura sub-division no. i, teliamura sub-division no. ii, kalyanpur sub-divisoin and mungiakami sub division, pwd(randb) and govt. residencial quarter within teliamura pwd complex during the year 2025-26.

Read more
Cleaning the trough of uact 2 and painting with ac black paint during the overhaul period of unit 2

Cleaning the trough&amp#x0d of uact 2 and painting with ac black paint during the overhaul period of unit 2

Read more
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Read more
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Read more
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah

Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah

Read more
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass

Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass

Read more
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Read more
Cleaning the trough of uact 1 and painting with ac black paint during the overhaul period of unit 1

Cleaning the trough&amp#x0d of uact 1 and painting with ac black paint during the overhaul period of unit 1

Read more
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26

Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26

Read more
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26

Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise