Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Material Recovery Facility Construction 🌱 The Municipal Administration And Water Supply (Maws) Department Of The State Government And Ut Invites Bids For The Construction Of A 5 Tpd (Tons Per Day) Material Recovery Facility Center At The Nallur Compost Yard Within Pollachi Municipality. 📅 Bid Submission Deadline: May 03, 2024, 3:00 Pm The Tender Fee Is Set At Inr 42500. Interested Contractors Must Possess The Necessary Qualifications And Experience In Environmental Infrastructure Projects. Proposals Should Include Detailed Project Plans, Cost Estimates, And Timelines For Completion. Keywords: Construction, Material Recovery Facility, Pollachi Municipality, Maws, Waste Management, Environmental Infrastructure, Government Tender| Particulars | Details |
|---|---|
| Title |
Construction Of 5 Tpd Material Recovery Facility Center At Nallur Compost Yard In Pollachi Municipality
|
| Description |
Construction Of 5 Tpd Material Recovery Facility Center At Nallur Compost Yard In Pollachi Municipality
|
| Organisation | MAWS | State Govt. and UT |
| Tender Id | 2024_MAWS_450633_1 |
|
Reference Number |
01760/2024/e1 |
| Tender Fee | 0 |
| EMD | 42500 |
| Tender Value | - |
| Place | Pollachi Municipality |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=536689 |
| Start Date | March 28, 2024 22:30 |
| End Date |
Expired
19/06/2024
Expired 846 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of abc surgical equipement for abc center in compost yard at vagaikulam potal in ambasamudram municipality
Supply of abc surgical equipement for abc center in compost yard at vagaikulam potal in ambasamudram municipality
Read moreRaising of block nursery in compost yard at sattur municipality.
Raising of block nursery in compost yard at sattur municipality.
Read moreReclamation of legacy waste at vadakadu compost yard in rameswaram municipality
Reclamation of legacy waste at vadakadu compost yard in rameswaram municipality
Read moreReclamations of existing dump yard additional quantity of legacy waste located at siraikkadu compost yard in bodinayakanur municipality
Reclamations of existing dump yard additional quantity of legacy waste located at siraikkadu compost yard in bodinayakanur municipality
Read moreRemoval of the legacy waste of 20561 mt through biomining procss to reclaim the exisiting dump yard located at mathalamparai road compost yard and boganallur compost yard in tenkasi municipality
Removal of the legacy waste of 20561 mt through biomining procss to reclaim the exisiting dump yard located at mathalamparai road compost yard and boganallur compost yard in tenkasi municipality
Read moreRemoval of the legacy waste through bio mining process to reclaim the existing dump yard located at mangulam compost yard in manamadurai municipality
Removal of the legacy waste through bio mining process to reclaim the existing dump yard located at mangulam compost yard in manamadurai municipality
Read moreRestoration of patches and potholes at municipal area roads in pollachi municipality
Restoration of patches and potholes at municipal area roads in pollachi municipality
Read moreProcurement of material recovery facility (mrf) machineryand equipment
Procurement of material recovery facility (mrf) machinery andequipment
Read moreSelection of concessionaire for setting up 1000 tpd waste handling facility comprising 700 tpd compost processing at perungudi dumpsite at chennai greater chennai corporation under design, build, finance, operate and transfer (dbfot) model on ppp mod
Selection of concessionaire for setting up 1000 tpd waste handling facility comprising 700 tpd compost processing at perungudi dumpsite at chennai greater chennai corporation under design, build, finance, operate and transfer (dbfot) model on ppp mod
Read moreConstruction of compost pit windrows for the processing of 05 tpd of wet waste.
Construction of compost pit windrows for the processing of 05 tpd of wet waste.
Read moreof your Industry type