Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Procurement, Assembly, Shop Testing, Supply, Erection, Testing And Commissioning Of Double Skin Air Handling Units Along With Accessories For Pc Lab Area Of Karp Ii, Kalpakkam.
|
| Description |
Design, Procurement, Assembly, Shop Testing, Supply, Erection, Testing And Commissioning Of Double Skin Air Handling Units Along With Accessories For Pc Lab Area Of Karp Ii, Kalpakkam.
|
| Organisation | Bhabha Atomic Research Centre | Central Govt. Ministry/Department |
| Tender Id | 2025_BARC_850132_1 |
|
Reference Number |
BARCF / INRPK -MA/KA/TR/173/2023/RT_1 |
| Tender Fee | 0 |
| EMD | 2.68 Lakh |
| Tender Value | - |
| Place | Kalpakkam |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=893655 |
| Start Date | March 07, 2025 15:30 |
| End Date |
Expired
21/03/2025
Expired 578 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design engineering including reverse engineering manufacturing supply erection testing and commissioning for renovation modernization and uprating of two units of rabs hydel power station
Design engineering including reverse engineering manufacturing supply erection testing and commissioning for renovation modernization and uprating of two units of rabs hydel power station
Read moreDesign, development, supply, erection, testing and commissioning of fully functional bio-toilet lab including lab equipment, consumables & chemicals to carryout required test (ph, cod & fcc) and comprehensive operation & maintenance of lab for 01 year at coaching depot, sealdah.
Design, development, supply, erection, testing and commissioning of fully functional bio-toilet lab including lab equipment, consumables & chemicals to carryout required test (ph, cod & fcc) and comprehensive operation & maintenance of lab for 01 year at coaching depot, sealdah.
Read moreDesign, engineering, supply, erection (installation and reinstallation), testing, commissioning of 11 kv and 33 kv motorized sf 6 insulated outdoor ring main units (scada-compatible, frtu pre-fitted, non-extendable)
Including integration with the existing and upcoming scada-dms/adms systems at ujjain and indore scada control centers and 5-year comprehensive amc at ujjain city and indore city along with communication infrastructure comprising sim cards
Read moreDesign, supply, erection, testing and commissioning of eot crane (double girder) 5t capacity including all spares and accessories as per technical specification no. els-ed-spec/eotc-1 and drawing
Design, supply, erection, testing and commissioning of eot crane (double girder) 5t capacity including all spares and accessories as per technical specification no. els-ed-spec/eotc-1 and drawing
Read moreWork of design, supply, erection, testing and commissioning of 220 kv outdoor gas insulated switchgear (gis) with double bus arrangement for 100 mva ict bay and bus coupler bay, as replacement of the existing 220 kv ais bays at 220/110/33 kv ponda su
Work of design, supply, erection, testing and commissioning of 220 kv outdoor gas insulated switchgear (gis) with double bus arrangement for 100 mva ict bay and bus coupler bay, as replacement of the existing 220 kv ais bays at 220/110/33 kv ponda su
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreDesign, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units along with accessories for pc lab area of karp-ii, kalpakkam.
Design, procurement, assembly, shop testing, supply,erection, testing and commissioning of double skin air handling units along with accessories for pc lab area of karp-ii, kalpakkam.
Read moreDesign, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units alone with accessories for pc lab area of karp-ii, kalpakkam.
Design, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units alone with accessories for pc lab area of karp-ii, kalpakkam.
Read moreDesign, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units along with accessories for lab areas of wip
Design, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units along with accessories for lab areas of wip
Read moreDesign, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units along with accessories for lab areas of wip
Design, procurement, assembly, shop testing, supply, erection, testing and commissioning of double skin air handling units along with accessories for lab areas of wip
Read moreof your Industry type