Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Residual Life Assessment Study Of Unit 4 Boiler (210 Mw Abl Make)
|
| Description |
Residual Life Assessment Study Of Unit 4 Boiler (210 Mw Abl Make)
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_790771_1 |
|
Reference Number |
GMOH-4(K)/CC/BM/3678/ E3188/24-25 |
| Tender Fee | 0 |
| EMD | 11949 |
| Tender Value | |
| Place | KTPS,Mecheda,Purba Medinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1753995 |
| Start Date | January 07, 2025 21:30 |
| End Date |
Expired
25/01/2025
Expired 526 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for purchase of c.i. boiler furnace link (big) as per sample/ drawing make-naveen/amba /sitson (approx wt of each link should be 9.50 to 10.00 kg)
Tender for purchase of c.i. boiler furnace link (big) as per sample/ drawing make-naveen/amba /sitson (approx wt of each link should be 9.50 to 10.00 kg)
Read moreProvn of veh parking shed in jco/or md accn at umrao vihar near qtr no 4/r/18 and 4/r/19 of certain mil unit at binnaguri mil stn under ge(s) binnaguri
As per tender docus
Read moreResidual life assessment study of unit-4 boiler (210 mw abl make)
Residual life assessment study of unit-4 boiler (210 mw abl make)
Read moreResidual life assessment study of unit-5 boiler (210 mw bhel make)
Residual life assessment study of unit-5 boiler (210 mw bhel make)
Read moreResidual life assessment study (rla study) of boilers of 210 mw unit-ii. ghtp, lehra mohabbat
Residual life assessment study (rla study) of boilers of 210 mw unit-ii. ghtp, lehra mohabbat
Read moreConducting residual life assessment rla study of 210 mw boiler unit iii of mettur thermal power station i during overhaul 2025_26
Conducting residual life assessment rla study of 210&#x0d mw boiler unit iii of mettur thermal power station i&#x0d during overhaul 2025_26
Read moreConducting residual life assessment rla study of 210 mw boiler unit i of mettur thermal power station i during overhaul 2025_ 26
Conducting residual life assessment rla study of 210 mw boiler unit i of mettur thermal power station i during overhaul 2025_ 26
Read moreConducting residual life assessment rla study of 210 mw boiler unit iv of mettur thermal power station i during overhaul 2025_ 26
Conducting residual life assessment rla study of 210 mw boiler unit iv of mettur thermal power station i during overhaul 2025_ 26
Read moreConducting residual life assessment rla study of 210 mw boiler unit i of mettur thermal power station i during overhaul 2025_ 26
Conducting residual life assessment rla study of 210 mw boiler unit i of mettur thermal power station i during overhaul 2025_ 26
Read moreConducting residual life assessment rla study of 210 mw boiler unit iv of mettur thermal power station i during overhaul 2025_ 26
Conducting residual life assessment rla study of 210 mw boiler unit iv of mettur thermal power station i during overhaul 2025_ 26
Read moreof your Industry type