Tender Details

Particulars Details
Title
Fabrication Of New Base Plate Required For 2000 Gpm Pump And Associate Motor Installation And Mechanical Repairing Of 160 Kw, 3.3 Kv Motor For Dewatering Under Balkudra Ocp For Bhurkunda Project Under Barka Sayal Area.
Description
Fabrication Of New Base Plate Required For 2000 Gpm Pump And Associate Motor Installation And Mechanical Repairing Of 160 Kw, 3.3 Kv Motor For Dewatering Under Balkudra Ocp For Bhurkunda Project Under Barka Sayal Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_317072_1
Reference
Number
PE(EnM)/BHK/e Tender/24-25/22
Tender Fee 0
EMD 3200
Tender Value
Place Office of Project Engineer EnM Bhurkunda colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328606
Start Date September 10, 2024 14:30
End Date

20/09/2024 ( Expired 273 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
For dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft

For dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft

Read more
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area

Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area

Read more
(1) complete rewinding of h.t motor 187 kw,3.3kv make-kirloskar,sl.no.3901207-3 of akwmc ocp.(2) rewinding and repairing starter of 250kw/3.3kv and rpm-1491,induction motor make-marathon sl.no.183110/3 of ocp akwmc colliery under katras area

(1) complete rewinding of h.t motor 187 kw,3.3kv make-kirloskar,sl.no.3901207-3 of akwmc ocp.(2) rewinding and repairing starter of 250kw/3.3kv and rpm-1491,induction motor make-marathon sl.no.183110/3 of ocp akwmc colliery under katras area

Read more
Erection of new ht feeders 6.6kv and 3.3kv oh/l from.kantapahri sub-station to pumping station meant for dewatering of sump at kantapahari patch of akwmc ocp katras area.

Erection of new ht feeders 6.6kv and 3.3kv oh/l from.kantapahri sub-station to pumping station meant for dewatering of sump at kantapahari patch of akwmc ocp katras area.

Read more
Repairing/rewinding of 220 nos of ceiling fans on as and when required basis for 01 year under different section of gm unit, barka-sayal area.

Repairing/rewinding of 220 nos of ceiling fans on as and when required basis for 01 year under different section of gm unit, barka-sayal area.

Read more
Complete repairing and rewinding and making new shaft of 400 kw, 3.3 kv, 1480 rpm marathon electric make 3 phase squirrel cage type induction ht pump-motor of patmohana colliery under sodepur area. (m/c no.- 3ff331269/4)

Complete repairing and rewinding and making new shaft of 400 kw, 3.3 kv, 1480 rpm marathon electric make 3 phase squirrel cage type induction ht pump-motor of patmohana colliery under sodepur area. (m/c no.- 3ff331269/4)

Read more
Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area

Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area

Read more
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area

Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area&#x0d

Read more
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area

Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area&#x0d

Read more
Fabrication of 02 nos drum pontoon complete with m.s plate, angle, channals, for installation of h.t. pump phularitand, amp colliery under barora area.

Fabrication of 02 nos drum pontoon complete with &#x0d m.s plate, angle, channals, for installation of h.t. pump &#x0d phularitand, amp colliery under barora area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise