Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Structures For Development Of Third Bench Of Office Cum Residential Complex Of Sawalkote He Project
|
Description |
Construction Of Retaining Structures For Development Of Third Bench Of Office Cum Residential Complex Of Sawalkote He Project At Tanger, District Ramban (J K)
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id | 2024_NHPC_811242_1 |
Reference Number |
NH/SHEP/PNC/2024/PR14324/15 |
Tender Fee | 590 |
EMD | 86000 |
Tender Value | |
Place | Sawalkote HE Project at Tanger, Dist- Ramban (JK) |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=852945 |
Start Date | June 14, 2024 23:30 |
End Date |
05/07/2024 ( Expired 343 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreDesign and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot
Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot
Read moreRedevelopment of plot bearing c.s. no. 6 148 abhyuday nagar, kalachowki by mhadb through a construction cum development contract by appointment of c and da 2025
Redevelopment of plot bearing c.s. no. 6 148 abhyuday nagar, kalachowki by mhadb through a&#x0d construction cum development contract by appointment of c and da
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreAppointment of proof engineering consultant (pec) for construction of distribution system for 7171.97 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through under ground pipe line irrigat
Appointment of proof engineering consultant&#x0d (pec) for&#x0d construction of distribution system for 7171.97 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through ugpl
Read moreConstruction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Read moreConstruction of retaining wall for p-1185 at rr site, kota, rajasthan
Construction of retaining wall for p-1185 at rr site, kota, 
 rajasthan
Read moreDevelopment of residential towers and community center including allied work at 37 d, green view apartments, gurugram on design, engineering, procurement and construction (epc) basis including operation and maintenance of 5 years
Development of residential towers and community 
 center including allied work at 37 d, green view 
 apartments, gurugram on design, engineering, 
 procurement and construction (epc) basis including 
 operation and maintenance of 5 years
Read moreof your Industry type