Tender Details

Particulars Details
Title
Arm Of Boundary Wall At 46th Bn Itbp Dalamu Raebareli (Up) For The Year 2023 24
Description
Arm Of Boundary Wall At 46th Bn Itbp Dalamu Raebareli (Up) For The Year 2023 24
Organisation DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department
Tender Id 2024_ITBP_788724_1
Reference
Number
ITBP/SHQ (LKO)/Engr/NIT/2024/4672
Tender Fee 0
EMD 13979
Tender Value
Place 46th Bn ITBP Dalamu Raebarli (UP)
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829036
Start Date January 04, 2024 22:00
End Date

11/01/2024 ( Expired 517 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Routine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.

Routine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.

Read more
Construction of boundary wall and allied infrastructure at muktyala in nw4 on epc mode schb

Construction of boundary wall and allied infrastructure at muktyala in nw4 on epc mode schb

Read more
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Read more
Construction of retaining wall for p-1185 at rr site, kota, rajasthan

Construction of retaining wall for p-1185 at rr site, kota, &#x0d rajasthan

Read more
Zone no. 04, ward no. 45, construction of boundary wall of kabristan located at kuthuliya on govindgarh main road.

Zone no. 04, ward no. 45, construction of boundary wall of kabristan located at kuthuliya on govindgarh main road.

Read more
Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.

Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.

Read more
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023

Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023

Read more
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Read more
Renovation of toilet bath and kitchen of sos mess and dormitory at 30 th bn itbp, jalandhar punjab.

Renovation of toilet bath and kitchen of sos mess and dormitory at 30th bn itbp, jalandhar punjab.

Read more
Repair/maint of damaged floor, wall tiles, joinery and allied works in kv area/10 afh/arjan area and repair/maint including camouflage painting and plastering of boundary wall at afs hasimar

Repair/maint of damaged floor, wall tiles, joinery and&#x0d allied works in kv area/10 afh/arjan area and repair/maint including&#x0d camouflage painting and plastering of boundary wall at afs hasimar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise