Tender Details
Particulars | Details |
---|---|
Title |
Extension Of 6.6k V 70sq.Mm Grade Cable, 3.3k V 70 Sq.Mm Grade Cable With 550 V Acb Drill Panel And 3 In Dia. Spray Pipeline With Manifold For Development Of Trunk Road For Panel 10, 11 12 In R Viia Seam By Lhcm 1 At 3 N4 Incline, J.P.Colly.
|
Description |
Extension Of 6.6k V 70sq.Mm Grade Cable, 3.3k V 70 Sq.Mm Grade Cable With 550 V Acb Drill Panel And 3 In Dia. Spray Pipeline With Manifold For Development Of Trunk Road For Panel 10, 11 12 In R Viia Seam By Lhcm 1 At 3 N4 Incline, J.P.Colly.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_310637_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/34 dated 12.06.2024 |
Tender Fee | 0 |
EMD | 5300 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321872 |
Start Date | June 18, 2024 16:30 |
End Date |
28/06/2024 ( Expired 297 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Strengthening of 6d sump at lhcm-1 by transportation and installation with necessary fabrication jobs of one 120-meter head complete turbine pump-motor at 6d/87l in r viia seam at 3n4 incline unit, jhanjra project colliery.
Read moreTransportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Transportation and fitting of 3 in dia spray pipeline along 4d and 85l in r-viia seam of lhcm-1 at 3n4 incline, j.p. colliery.
Read moreTransportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Transportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Read moreInstallation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreInstallation of one no. 6.6kv substation at 4d 79l-80l and installation of 3.3kv cable in r-viia seam at 3n4 incline unit, jhanjra project colliery
Installation of one no. 6.6kv substation at 4d 79l-80l and installation of 3.3kv cable in r-viia seam at 3n4 incline unit, jhanjra project colliery
Read moreTransportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1x90kw, 550v, single drive belt conveyor along 4d from 80l to 85l in r-viia seam at 3n4 incline, j.p.colly.
Transportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1x90kw, 550v, single drive belt conveyor along 4d from 80l to 85l in r-viia seam at 3n4 incline, j.p.colly.
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreTransportation-installation of 310.5 mtr. 1000mm belt structure with belting and nine times transportation-installation of tail end unit along 5r for development of trunk road for panel-10, 11 n 12 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Transportation-installation of 310.5 mtr. 1000mm belt structure with belting and nine times transportation-installation of tail end unit along 5r for development of trunk road for panel-10, 11 n 12 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Read moreTransportation installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation-installation of tail end unit along 74l for further development of panel-10 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Transportation installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation-installation of tail end unit along 74l for further development of panel-10 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Read moreInstallation of 3 in dia. spray pipeline from -8d/67l to -7d/74al in r-vii seam of lhcm-2 section at 3n4 incline, jpc
Installation of 3 in dia. spray pipeline from -8d/67l to -7d/74al in r-vii seam of lhcm-2 section at 3n4 incline, jpc
Read moreof your Industry type