Tender Details

Particulars Details
Title
) Improvement Estimate For Overload Dt Uzhavankonam Ss 100 Kva By Proposed 1 Nos 63 Kva Dt In Kalliyankadu Feeder Under Parvathipuram Section.
Description
) Improvement Estimate For Overload Dt Uzhavankonam Ss 100 Kva By Proposed 1 Nos 63 Kva Dt In Kalliyankadu Feeder Under Parvathipuram Section.
Organisation TNEB Limited | TANGEDCO | CE-Tirunelveli - TANGEDCO | SE-Kannyakumari - TANGEDCO
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD 2950
Tender Value -
Place Tamil Nadu
Link Login to view
Start Date October 05, 2026 23:30
End Date
Open 19/10/2026

6 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Improvement estimate for vcb with plinth arrangements for newly proposed 11kv kandanvilai feeder under 110 33 11kv cheramangalam sub station

Improvement estimate for vcb with plinth arrangements for newly proposed 11kv kandanvilai feeder under 110 33 11kv cheramangalam sub station

Read more
This estimate is created for bifercation of 11 kv sudwas irr feeder from ss madkota to lasuliya goyal village dc jaisinghpura

This estimate is created for bifercation of 11 kv sudwas irr feeder from ss madkota to lasuliya goyal village dc jaisinghpura

Read more
An estimate is framed for bifurcation of 33kv achalpura feeder from ehv manasa to 33/11 sawan ss tapping due to overloading of achalpura feeder . under sstd 2026-27 vid admin . apprvl no md/wz/08-03/6738 dt 08/09/2026 under manasa division

An estimate is framed for bifurcation of 33kv achalpura feeder from ehv manasa to 33/11 sawan ss tapping due to overloading of achalpura feeder . under sstd 2026-27 vid admin . apprvl no md/wz/08-03/6738 dt 08/09/2026 under manasa division

Read more
Estimate for construction of new 11 kv ht line and 3-phase lt line and lt re-organization to proposed 63 kva, 11/0.4 kv s/stn tikkari ii in (e) section local under electrical sub- division, hpsebl, chauntra.

Estimate for construction of new 11 kv ht line and 3-phase lt line and lt re-organization to proposed 63 kva, 11/0.4 kv s/stn tikkari ii in (e) section local under electrical sub- division, hpsebl, chauntra.

Read more
Estimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.

Estimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.

Read more
Administrative approval letter no md/wz/08-03/6738 inodre dt. 08.04.2026 for new 33 kv line from 132 ehv karwakhedi to khelukheda ss to bifurcate overloaded 33 kv feeder asavata of tal r d/c under sstd scheme 2026-27

Administrative approval letter no md/wz/08-03/6738 inodre dt. 08.04.2026 for new 33 kv line from 132 ehv karwakhedi to khelukheda ss to bifurcate overloaded 33 kv feeder asavata of tal r d/c under sstd scheme 2026-27

Read more
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis

Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis

Read more
Imp estimate for newly proposed 1 no 63 kva dt palavilai to reduce the overload existing kandanvilai ss 1v 100 kva dt in bethelpuram under eraniel section in eraniel c and i section in thuckalay division

Imp estimate for newly proposed 1 no 63 kva dt palavilai to reduce the overload existing kandanvilai ss 1v 100 kva dt in bethelpuram under eraniel section in eraniel c and i section in thuckalay division

Read more
Imp estimate for segregation of existing padmanaphapuram 100 kva dt in aloor feeder for providing 1 no 63 kva dt charode feeder under thuckalay section

Imp estimate for segregation of existing padmanaphapuram 100 kva dt in aloor feeder for providing 1 no 63 kva dt charode feeder under thuckalay section

Read more
Work proposed various site existing overload transformer make a new double pole 25 kva and 63 kva

Work proposed various site existing overload transformer make a new double pole 25 kva and 63 kva

Read more
Click Here to Download Dockets
of your Industry type