Tender Details

Particulars Details
Title
Construction Of Cc Road From Rajkumar House To Romit Dhingra House For Awas Vikas At Ward No. 48
Description
Construction Of Cc Road From Rajkumar House To Romit Dhingra House For Awas Vikas At Ward No. 48
Organisation Saharanpur Municipal Corporation Saharanpur UP | State Govt. and UT
Tender Id 2025_NNSAH_1090841_1
Reference
Number
5799 B
Tender Fee 826
EMD 56119
Tender Value
Place saharanpur
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2003441

Start Date November 18, 2025 23:30
End Date
Expired 08/12/2025

Expired 227 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Nit no 01 work no 01

Door to door collection of waste in all wards 1 to 25 for three years iot based door to door coolection of waste from all residential establishment and commerical establishemnt in both day and night shift of municipal board asind bhilwara rajastahn

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise