Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Suction And Delivery Valves Of Hot Well Pump 1,2,3 And 4, Bed Ash Cooler Pump 1 And 2 In Boiler 7 And Replacement Of Sealing Rope Inside The Furnace In Boiler 6
|
| Description |
Replacement Of Suction And Delivery Valves Of Hot Well Pump 1,2,3 And 4, Bed Ash Cooler Pump 1 And 2 In Boiler 7 And Replacement Of Sealing Rope Inside The Furnace In Boiler 6
|
| Organisation | Tamilnadu Newsprint and Papers Limited | State Govt. and UT |
| Tender Id | 2025_TNPL_605243_1 |
|
Reference Number |
TNPL/TOS/U1/252613004385 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | TOS, Kagithapuram |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=723451 |
| Start Date | September 18, 2025 00:10 |
| End Date |
Expired
03/10/2025
Expired 376 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of ece make u6 boiler goods lift rope sheave replacement at ntpc tanda
Maintenance of ece make u6 boiler goods lift rope sheave replacement at ntpc tanda
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreRemoval of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreReplacement of sealing rope inside the furnace in boiler 5 and 6 in tnpl unit-i
Replacement of sealing rope inside the furnace in boiler 5 and 6 in tnpl unit-i
Read moreReplacement of suction and delivery valves of hot well pump 1,2,3 and 4, bed ash cooler pump 1 and 2 in boiler 7 in tnpl unit-i
Replacement of suction and delivery valves of hot well pump 1,2,3 and 4, bed ash cooler pump 1 and 2 in boiler 7 in tnpl unit-i
Read moreof your Industry type