Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
A/R And M/O Link Road To Village Nako Km. 0/00 To 1/750 (Sh Repair Of Pot Holes From Km. 0/00 To 1/750) (Under Mmsrry
|
Description |
A/R And M/O Link Road To Village Nako Km. 0/00 To 1/750 (Sh Repair Of Pot Holes From Km. 0/00 To 1/750) (Under Mmsrry
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 350 |
EMD | 8000 |
Tender Value | |
Place | Nako under Pooh Sub Division |
Link |
AAAAAAAAAA Login to view |
Start Date | June 28, 2025 18:30 |
End Date |
06/07/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreWidening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham
Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreof your Industry type